My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2900 - Site Mitigation Program
>
PR0009229
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 9:39:55 AM
Creation date
6/26/2020 5:02:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009229
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0004047
FACILITY_NAME
STOCKTON ARMY AVIATION SUPPORT FACILITY / PFAS SITE INSPECTION
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726004 AND 17726034
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2000 STIMSON ST STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Inspection UFP-QAPP Addendum <br />Stockton AASF, Stockton, California <br />QAPP Worksheet #9: Technical Project Planning Session <br />Summary <br />This worksheet serves as a record of future Technical Project Planning (TPP) sessions. The intent <br />is to provide a concise record of participants, key decisions or agreements reached, and action <br />items. Minutes will be approved by all participants prior to being implemented into the QAPP <br />Addendum (TPP Meeting Minutes, Appendix A). <br />AECOM will implement the TPP process as listed in Engineer Manual 200-1-2 (USACE, 2016) <br />including facility meetings in a professional and organized manner to obtain consensus on specific <br />Data Quality Objectives (DQOs) for SI work. Three meetings will be held (in person and/ or <br />teleconference) per the Performance Work Statement as described below: <br />• TPP Meeting 1 - Discuss DQOs (pre -work plan) and CSM <br />• TPP Meeting 2 - Finalize work plan technical approach <br />• TPP Meeting 3 - Verify all data gaps have been filled and finalize SI Report <br />AECOM QAPP Worksheet #9 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.