My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2417
>
2900 - Site Mitigation Program
>
PR0523601
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 3:02:48 PM
Creation date
6/30/2020 2:13:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523601
PE
2950
FACILITY_ID
FA0015930
FACILITY_NAME
R & L DIESEL SERVICE INC
STREET_NUMBER
2417
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95205
APN
11709007
CURRENT_STATUS
01
SITE_LOCATION
2417 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> tank(depth of cover+ S ft. + 1 ft.). Soil samples will be taken from opposite sides of the <br /> tank and analyzed for TPH motor oil and TPH diesel. The samples will be stored in an <br /> iced container and transported under chain of custody to a state certified laboratory for <br /> analysis. Soil cuttings will be stored in a labeled drum on site pending receipt of <br /> analytical results. Similarly, the concrete slab will not be repaired until the analytical <br /> results have been received and evaluated, in case additional action is required. <br /> The manual sampler equipment will be used to probe for the presence of underground <br /> tanks in front of the Parts Building. This probing will be more extensive than that <br /> required for the used oil tank, as it will be necessary to define the size and location of two <br /> tanks (if present), before soil samples can be taken. Depending on the results of the <br /> probing,two samples per tank(opposite sides)will be taken, 12 inches below the bottom <br /> of the tanks, and analyzed for TPH diesel and TPH gasoline. Samples will be stored in an <br /> iced container and transported under chain of custody to a state certified laboratory for <br /> analysis. Once again,the pavement will not be repaired until analytical results have been <br /> received and evaluated. Soil cuttings will be stored in a labeled drum on site pending <br /> receipt of analytical results. <br /> 6.0 Report Preparation <br /> At the conclusion of the work described above, a report, including findings of the <br /> investigation and all analytical results, will be prepared and forwarded to the SJEHD. <br /> Closure letters will be requested as appropriate. <br /> 7.0 Health and Safety <br /> A Health and Safety plan to support field activities has been developed as a stand alone <br /> document and is included in Appendix A. <br /> 4 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.