Kennedy/Jenks Consultants <br /> Section 4: Schedule and Reporting <br /> ri <br /> Following receipt of approval of the Work Plan from the RWQCB, Woodbridge will proceed with <br /> the activities described in this Work Plan. As noted in Section 3, the study will be performed <br /> over a period of two years. The following implementation schedule is anticipated: <br /> • March 2008 <br /> o Prepare test plots for cropping (e.g. grading) <br /> o Install soil moisture monitoring and rain gauge equipment <br /> o Conduct initial soil and deep vadose zone soil sampling event <br /> • May 2008 <br /> o Plant Crops <br /> • May 2008 - September 2008 <br /> o Collect observations of crop growth <br /> o Collect irrigation water quality data <br /> , <br /> o Collect soil moisture, precipitation, ET, and irrigation data <br /> o Collect deep soil samples for percolation calculations <br /> • September 2008 <br /> o Harvest crops planted in May 2008 <br /> o Plant new crops <br /> • September 2008 — May 2009 <br /> o Collect observations of crop growth <br /> o Collect irrigation water quality data <br /> o Collect soil moisture, precipitation, ET, and irrigation data <br /> • May 2009 <br /> o Harvest crops planted in September 2008 <br /> o Plant new crops <br /> Crop Uptake and Assimilative Capacity Work Plan, Page 8 <br /> Woodbridge Winery, Acampo, California <br />