|
GENERAL OPERATION AND MAINTENANCE NOTES: KEPT ON—SITE. WILL BE CLEARLY POSTED AND SITE PERSONNEL WILL BE MADE
<br /> EMPLOYEE TRAINING AWARE OF THE PROCEDURES AND THE LOCATION OF THE
<br /> PURPOSE & GOALS INFORMATION AND CLEAN—UP SUPPLIES.
<br /> THE PROPERTY OWNER WILL HAVE AN EMPLOYEE—TRAINING PROGRAM, MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEAN—UP WILL
<br /> THE PURPOSE OF THIS OPERATION AND MAINTENANCE PLAN IS TO BE KEPT IN THE MATERIAL STORAGE AREA ON—SITE. EQUIPMENT AND
<br /> ENSURE THAT THE STORMWATER MANAGEMENT COMPONENTS ARE WITH ANNUAL UP—DATES, TO ENSURE THAT THE QUALIFIED EMPLOYEES MATERIALS WILL INCLUDE BUT NOT BE LIMITED TO: ABSORBENT
<br /> OPERATED IN ACCORDANCE WITH ALL APPROVALS AND PERMITS. THE CHARGED WITH MAINTAINING THE BUILDINGS AND GROUNDS DO SO IN BOOMS OR MATS, BROOMS, DUST PANS, MOPS, RAGS, GLOVES,
<br /> PRIMARY GOAL IS TO INFORM ALL THE PROPERTY MANAGERS ABOUT ACCORDANCE WITH THE APPROVED PERMIT CONDITIONS. ALL EMPLOYEES GOGGLES, SAND, AND PLASTIC AND METAL TRASH CONTAINERS
<br /> HOW THE SYSTEM OPERATES AND WHAT MAINTENANCE ITEMS ARE THAT HAVE MAINTENANCE DUTIES WILL BE ADEQUATELY INFORMED OF SPECIFICALLY FOR THIS PURPOSE.
<br /> NECESSARY TO PROTECT DOWNSTREAM WETLANDS AND WATERCOURSES. THEIR RESPONSIBILITIES. ALL SPILLS WILL BE CLEANED IMMEDIATELY AFTER DISCOVERY.
<br /> THE SECONDARY GOAL IS TO PROVIDE A PRACTICAL, EFFICIENT MEANS THE SPILL AREA WILL BE KEPT WELL—VENTILATED AND PERSONNEL
<br /> OF MAINTENANCE PLANNING AND RECORD KEEPING VERIFYING PERMIT WILL WEAR APPROPRIATE PROTECTIVE CLOTHING TO PREVENT INJURY
<br /> COMPLIANCE.
<br /> SITE MAINTENANCE NOTES: FROM CONTACT WITH HAZARDOUS SUBSTANCE.
<br /> AN ESSENTIAL COMPONENT OF A SUCCESSFUL STORMWATER SYSTEM IS SPILLS OF TOXIC OR HAZARDOUS MATERIAL, REGARDLESS OF SIZE,
<br /> THE ONGOING OPERATION AND MAINTENANCE OF THE VARIOUS PARKING LOTS WILL BE REPORTED TO THE APPROPRIATE STATE OR LOCAL
<br /> COMPONENTS OF THE STORMWATER DRAINAGE, CONTROL, AND GOVERNMENT AGENCY.
<br /> CONVEYANCE SYSTEMS. FAILURE TO PROVIDE EFFECTIVE MAINTENANCEIF A SPILL OCCURS, THIS PLAN WILL BE ADJUSTED TO INCLUDE
<br /> CAN REDUCE THE HYDRAULIC CAPACITY AND THE POLLUTANT REMOVAL PARKING LOTS AND SIDEWALKS SHALL BE SWEPT NECESSARY BY MEASURES TO PREVENT THIS TYPE OF SPILL FROM REOCCURRING
<br /> EFFICIENCY OF STORMWATER PRACTICES. THE PROPERTY OWNER TO CLEAN TRASH AND OTHER DEBRIS. THE AND HOW TO CLEAN THE SPILL IF THERE IS ANOTHER ONE. A
<br /> PROPERTY OWNER WILL SWEEP PARKING LOTS ON THE PROPERTY IN THE DESCRIPTION OF THE SPILL, THE CAUSE, AND THE REMEDIATION
<br /> MANY PEOPLE EXPECT THAT STORMWATER FACILITIES WILL CONTINUE TO SPRING TO REMOVE WINTER ACCUMULATIONS OF ROAD SAND. MEASURES WILL ALSO BE INCLUDED.
<br /> FUNCTION CORRECTLY AS DESIGNED FOREVER. HOWEVER, IT IS
<br /> INEVITABLE THAT DETERIORATION OF THE STORMWATER INFRASTRUCTURE
<br /> WILL OCCUR ONCE IT BECOMES OPERATIONAL. THE QUESTION IS NOT LANDSCAPING A SPILL REPORT SHALL BE PREPARED BY THE PROPERTY OWNER
<br /> WHETHER STORMWATER MANAGEMENT SYSTEM MAINTENANCE IS FOLLOWING EACH OCCURRENCE AND SUBMITTED TO THE CONSERVATION
<br /> NECESSARY BUT HOW OFTEN. IDEALLY, A PROGRAM SHOULD ADDRESS COMMISSION. THE SPILL REPORT SHALL PRESENT A DESCRIPTION OF THE
<br /> OPERATION AND MAINTENANCE CONCERNS PROACTIVELY INSTEAD OF THE MANAGEMENT COMPANY RETAINED BY THE PROPERTY OWNER WILL RELEASE, INCLUDING QUANTITY AND TYPE OF MATERIAL, DATE OF SPILL,
<br /> REACTING TO PROBLEMS THAT OCCUR SUCH AS FLOODING, OR WATER MAINTAIN LANDSCAPED AREAS. NORMALLY THE LANDSCAPING CIRCUMSTANCES LEADING TO THE RELEASE, LOCATION OF SPILL,
<br /> QUALITY DEGRADATION ASSOCIATED WITH EROSION, CLOGGING, OR MAINTENANCE WILL CONSIST OF PRUNING, MULCHING, PLANTING, MOWING RESPONSE ACTIONS AND PERSONNEL, DOCUMENTATION OF NOTIFICATIONS
<br /> OUTRIGHT FAILURE OF ONE OR MORE PRACTICES. THUS, ON—GOING LAWNS, RAKING LEAVES, ETC. USE OF FERTILIZERS AND PESTICIDES WILL AND CORRECTIVE MEASURES IMPLEMENTED TO PREVENT REOCCURRENCE.
<br /> MAINTENANCE IS A VITAL PART OF ENSURING THE OPERATIONAL BE CONTROLLED AND LIMITED TO MINIMAL AMOUNTS NECESSARY FOR
<br /> SUCCESS OF STORMWATER MANAGEMENT FACILITIES AND IS CRITICAL TO HEALTHY LANDSCAPE MAINTENANCE. THE PROPERTY OWNER SHALL IDENTIFY AN APPROPRIATELY QUALIFIED
<br /> ACHIEVING AN EXTENDED SERVICE LIFE OF CONTINUOUS OPERATION AS AND TRAINED SITE EMPLOYEE INVOLVED WITH DAY—TO—DAY SITE
<br /> x DESIGNED. THE LAWN AREAS, ONCE ESTABLISHED, WILL BE MAINTAINED AT A OPERATIONS TO BE THE SPILL PREVENTION AND CLEAN—UP
<br /> THERE ARE TWO KEY COMPONENTS TO ADEQUATELY MAINTAINING A TYPICAL HEIGHT OF 3 X". THIS WILL ALLOW THE GRASS TO BE COORDINATOR. THE NAME(S) OF RESPONSIBLE SPILL PERSONNEL SHALL
<br /> a STORMWATER MANAGEMENT INFRASTRUCTURE: MAINTAINED WITH MINIMAL IMPACT FROM WEEDS AND/OR PESTS. THE BE POSTED ON—SITE. EACH EMPLOYEE SHALL BE INSTRUCTED THAT ALL
<br /> 0 LOW—MAINTENANCE AREAS WILL BE MAINTAINED AS A MEADOW OR SPILLS ARE TO BE REPORTED TO THE SPILL PREVENTION AND CLEAN—UP
<br /> 3 PERIODIC AND SCHEDULED INSPECTIONS, ANDALLOWED TO REVERT TO NATURAL CONDITIONS. TOPSOIL, BRUSH, COORDINATOR.
<br /> MAINTENANCE SCHEDULING AND PERFORMANCE. LEAVES, CLIPPINGS, WOODCHIPS, MULCH, EQUIPMENT, AND OTHER
<br /> FD MATERIAL SHALL BE STORED OFF SITE.
<br /> N
<br /> RESPONSIBLE PARTIES
<br /> OUTDOOR STORAGE
<br /> THE PROPERTY OWNER WILL BE RESPONSIBLE FOR IMPLEMENTING THE
<br /> a PLAN ON THE PROPERTY. IT IS NOT MANDATORY THAT ALL INSPECTORS THERE WILL BE NO OUTDOOR STORAGE OF HAZARDOUS CHEMICALS,
<br /> BE TRAINED ENGINEERS, BUT THEY SHOULD HAVE SOME KNOWLEDGE OR DE—ICING AGENTS, FERTILIZER, PESTICIDES, OR HERBICIDES ANYWHERE
<br /> o EXPERIENCE WITH STORMWATER SYSTEMS. IN GENERAL, TRAINED AROUND THE BUILDINGS.
<br /> STORMWATER ENGINEERS SHOULD, HOWEVER, DIRECT THEM.
<br /> o INSPECTIONS BY REGISTERED ENGINEERS SHOULD BE PERFORMED WHERE DEICING AND SNOW REMOVAL & STORAGE
<br /> ROUTINE INSPECTION HAS REVEALED A QUESTION OF STRUCTURAL OR
<br /> HYDRAULIC INTEGRITY AFFECTING PUBLIC SAFETY.
<br /> THE USE OF CLEAN SAND MAY BE USED TO AID TRACTION IN
<br /> LIST OF PERMITS & SPECIAL CONDITIONS CONJUNCTION WITH SALT AND/OR CHEMICALS FOR DEICING, SNOW
<br /> MELTING AND OTHER RELATED WINTER WEATHER MANAGEMENT. SNOW
<br /> SHALL BE SHOVELED AND PLOWED FROM SIDEWALK AND PARKING AREAS
<br /> % THE PROJECT WILL RECEIVE SEVERAL PERMITS, WHICH MAY CONTAIN AS SOON AS PRACTICAL DURING AND AFTER WINTER STORMS. SAND
<br /> o SPECIAL CONDITIONS THAT REQUIRE COMPLIANCE BY THE PROPERTY ACCUMULATION SHALL BE REMOVED FROM THE SITE AT THE END OF THE
<br /> N OWNER AND MAINTENANCE CONTRACTORS. THESE PERMITS MAY INCLUDE WINTER SEASON OR APPROPRIATE TIME WHEN SEASONAL SNOW HAS
<br /> o THE FOLLOWING: MELTED. ALTERNATIVE DEICING METHODS MUST BE SUBMITTED PRIOR TO
<br /> 2 USE ONSITE FOR REVIEW TO THE CITY OF HOLYOKE FOR APPROVAL.
<br /> o CITY OF STOCKTON PERMITS:
<br /> DEMOLITION PERMIT
<br /> w SNOW SHALL NOT BE STOCKPILED WITHIN THE 100' WETLAND SETBACK
<br /> Q •• BUILDING PERMIT AREA OR IN THE DETENTION BASIN
<br /> •• SITE PLAN REVIEW
<br /> o SPILL CONTROL
<br /> m
<br /> i MAINTENANCE LOGS THE FOLLOWING PRACTICES WILL BE FOLLOWED FOR SPILL PREVENTION
<br /> o THE PROPERTY OWNER WILL KEEP A RECORD OF ALL MAINTENANCE AND CLEAN—UP:
<br /> a PROCEDURES PERFORMED, DATE OF INSPECTION/ CLEANINGS, ETC.
<br /> COPIES OF INSPECTION REPORTS AND MAINTENANCE RECORDS SHALL BE MANUFACTURER'S RECOMMENDED METHODS FOR SPILL CLEAN—UP
<br /> 0
<br /> N
<br /> O
<br /> N
<br /> O
<br /> M
<br /> M
<br /> . ARCHITECTURE DesiOPERATIONS AND MAINTENANCE NOTES Drawn ENGINEERING B.S.R.
<br /> Reviewed S.M.K. OM
<br /> _
<br /> ENVIRONMENTAL PROPOSED AIR CARGO FACILITY
<br /> Scale NONE
<br /> VkmLAND SURVEYING 4725 SOUTH B STREET Project No. 1902145
<br /> STOCKTON, CALIFORNIA Date 04/01/20
<br /> CW111:10'al" CAD File OM190214501
<br /> ©2020 BL COMPANIES,INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON,FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BE COMPANIES.
<br />
|