Laserfiche WebLink
GENERAL OPERATION AND MAINTENANCE NOTES: KEPT ON—SITE. WILL BE CLEARLY POSTED AND SITE PERSONNEL WILL BE MADE <br /> EMPLOYEE TRAINING AWARE OF THE PROCEDURES AND THE LOCATION OF THE <br /> PURPOSE & GOALS INFORMATION AND CLEAN—UP SUPPLIES. <br /> THE PROPERTY OWNER WILL HAVE AN EMPLOYEE—TRAINING PROGRAM, MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEAN—UP WILL <br /> THE PURPOSE OF THIS OPERATION AND MAINTENANCE PLAN IS TO BE KEPT IN THE MATERIAL STORAGE AREA ON—SITE. EQUIPMENT AND <br /> ENSURE THAT THE STORMWATER MANAGEMENT COMPONENTS ARE WITH ANNUAL UP—DATES, TO ENSURE THAT THE QUALIFIED EMPLOYEES MATERIALS WILL INCLUDE BUT NOT BE LIMITED TO: ABSORBENT <br /> OPERATED IN ACCORDANCE WITH ALL APPROVALS AND PERMITS. THE CHARGED WITH MAINTAINING THE BUILDINGS AND GROUNDS DO SO IN BOOMS OR MATS, BROOMS, DUST PANS, MOPS, RAGS, GLOVES, <br /> PRIMARY GOAL IS TO INFORM ALL THE PROPERTY MANAGERS ABOUT ACCORDANCE WITH THE APPROVED PERMIT CONDITIONS. ALL EMPLOYEES GOGGLES, SAND, AND PLASTIC AND METAL TRASH CONTAINERS <br /> HOW THE SYSTEM OPERATES AND WHAT MAINTENANCE ITEMS ARE THAT HAVE MAINTENANCE DUTIES WILL BE ADEQUATELY INFORMED OF SPECIFICALLY FOR THIS PURPOSE. <br /> NECESSARY TO PROTECT DOWNSTREAM WETLANDS AND WATERCOURSES. THEIR RESPONSIBILITIES. ALL SPILLS WILL BE CLEANED IMMEDIATELY AFTER DISCOVERY. <br /> THE SECONDARY GOAL IS TO PROVIDE A PRACTICAL, EFFICIENT MEANS THE SPILL AREA WILL BE KEPT WELL—VENTILATED AND PERSONNEL <br /> OF MAINTENANCE PLANNING AND RECORD KEEPING VERIFYING PERMIT WILL WEAR APPROPRIATE PROTECTIVE CLOTHING TO PREVENT INJURY <br /> COMPLIANCE. <br /> SITE MAINTENANCE NOTES: FROM CONTACT WITH HAZARDOUS SUBSTANCE. <br /> AN ESSENTIAL COMPONENT OF A SUCCESSFUL STORMWATER SYSTEM IS SPILLS OF TOXIC OR HAZARDOUS MATERIAL, REGARDLESS OF SIZE, <br /> THE ONGOING OPERATION AND MAINTENANCE OF THE VARIOUS PARKING LOTS WILL BE REPORTED TO THE APPROPRIATE STATE OR LOCAL <br /> COMPONENTS OF THE STORMWATER DRAINAGE, CONTROL, AND GOVERNMENT AGENCY. <br /> CONVEYANCE SYSTEMS. FAILURE TO PROVIDE EFFECTIVE MAINTENANCEIF A SPILL OCCURS, THIS PLAN WILL BE ADJUSTED TO INCLUDE <br /> CAN REDUCE THE HYDRAULIC CAPACITY AND THE POLLUTANT REMOVAL PARKING LOTS AND SIDEWALKS SHALL BE SWEPT NECESSARY BY MEASURES TO PREVENT THIS TYPE OF SPILL FROM REOCCURRING <br /> EFFICIENCY OF STORMWATER PRACTICES. THE PROPERTY OWNER TO CLEAN TRASH AND OTHER DEBRIS. THE AND HOW TO CLEAN THE SPILL IF THERE IS ANOTHER ONE. A <br /> PROPERTY OWNER WILL SWEEP PARKING LOTS ON THE PROPERTY IN THE DESCRIPTION OF THE SPILL, THE CAUSE, AND THE REMEDIATION <br /> MANY PEOPLE EXPECT THAT STORMWATER FACILITIES WILL CONTINUE TO SPRING TO REMOVE WINTER ACCUMULATIONS OF ROAD SAND. MEASURES WILL ALSO BE INCLUDED. <br /> FUNCTION CORRECTLY AS DESIGNED FOREVER. HOWEVER, IT IS <br /> INEVITABLE THAT DETERIORATION OF THE STORMWATER INFRASTRUCTURE <br /> WILL OCCUR ONCE IT BECOMES OPERATIONAL. THE QUESTION IS NOT LANDSCAPING A SPILL REPORT SHALL BE PREPARED BY THE PROPERTY OWNER <br /> WHETHER STORMWATER MANAGEMENT SYSTEM MAINTENANCE IS FOLLOWING EACH OCCURRENCE AND SUBMITTED TO THE CONSERVATION <br /> NECESSARY BUT HOW OFTEN. IDEALLY, A PROGRAM SHOULD ADDRESS COMMISSION. THE SPILL REPORT SHALL PRESENT A DESCRIPTION OF THE <br /> OPERATION AND MAINTENANCE CONCERNS PROACTIVELY INSTEAD OF THE MANAGEMENT COMPANY RETAINED BY THE PROPERTY OWNER WILL RELEASE, INCLUDING QUANTITY AND TYPE OF MATERIAL, DATE OF SPILL, <br /> REACTING TO PROBLEMS THAT OCCUR SUCH AS FLOODING, OR WATER MAINTAIN LANDSCAPED AREAS. NORMALLY THE LANDSCAPING CIRCUMSTANCES LEADING TO THE RELEASE, LOCATION OF SPILL, <br /> QUALITY DEGRADATION ASSOCIATED WITH EROSION, CLOGGING, OR MAINTENANCE WILL CONSIST OF PRUNING, MULCHING, PLANTING, MOWING RESPONSE ACTIONS AND PERSONNEL, DOCUMENTATION OF NOTIFICATIONS <br /> OUTRIGHT FAILURE OF ONE OR MORE PRACTICES. THUS, ON—GOING LAWNS, RAKING LEAVES, ETC. USE OF FERTILIZERS AND PESTICIDES WILL AND CORRECTIVE MEASURES IMPLEMENTED TO PREVENT REOCCURRENCE. <br /> MAINTENANCE IS A VITAL PART OF ENSURING THE OPERATIONAL BE CONTROLLED AND LIMITED TO MINIMAL AMOUNTS NECESSARY FOR <br /> SUCCESS OF STORMWATER MANAGEMENT FACILITIES AND IS CRITICAL TO HEALTHY LANDSCAPE MAINTENANCE. THE PROPERTY OWNER SHALL IDENTIFY AN APPROPRIATELY QUALIFIED <br /> ACHIEVING AN EXTENDED SERVICE LIFE OF CONTINUOUS OPERATION AS AND TRAINED SITE EMPLOYEE INVOLVED WITH DAY—TO—DAY SITE <br /> x DESIGNED. THE LAWN AREAS, ONCE ESTABLISHED, WILL BE MAINTAINED AT A OPERATIONS TO BE THE SPILL PREVENTION AND CLEAN—UP <br /> THERE ARE TWO KEY COMPONENTS TO ADEQUATELY MAINTAINING A TYPICAL HEIGHT OF 3 X". THIS WILL ALLOW THE GRASS TO BE COORDINATOR. THE NAME(S) OF RESPONSIBLE SPILL PERSONNEL SHALL <br /> a STORMWATER MANAGEMENT INFRASTRUCTURE: MAINTAINED WITH MINIMAL IMPACT FROM WEEDS AND/OR PESTS. THE BE POSTED ON—SITE. EACH EMPLOYEE SHALL BE INSTRUCTED THAT ALL <br /> 0 LOW—MAINTENANCE AREAS WILL BE MAINTAINED AS A MEADOW OR SPILLS ARE TO BE REPORTED TO THE SPILL PREVENTION AND CLEAN—UP <br /> 3 PERIODIC AND SCHEDULED INSPECTIONS, ANDALLOWED TO REVERT TO NATURAL CONDITIONS. TOPSOIL, BRUSH, COORDINATOR. <br /> MAINTENANCE SCHEDULING AND PERFORMANCE. LEAVES, CLIPPINGS, WOODCHIPS, MULCH, EQUIPMENT, AND OTHER <br /> FD MATERIAL SHALL BE STORED OFF SITE. <br /> N <br /> RESPONSIBLE PARTIES <br /> OUTDOOR STORAGE <br /> THE PROPERTY OWNER WILL BE RESPONSIBLE FOR IMPLEMENTING THE <br /> a PLAN ON THE PROPERTY. IT IS NOT MANDATORY THAT ALL INSPECTORS THERE WILL BE NO OUTDOOR STORAGE OF HAZARDOUS CHEMICALS, <br /> BE TRAINED ENGINEERS, BUT THEY SHOULD HAVE SOME KNOWLEDGE OR DE—ICING AGENTS, FERTILIZER, PESTICIDES, OR HERBICIDES ANYWHERE <br /> o EXPERIENCE WITH STORMWATER SYSTEMS. IN GENERAL, TRAINED AROUND THE BUILDINGS. <br /> STORMWATER ENGINEERS SHOULD, HOWEVER, DIRECT THEM. <br /> o INSPECTIONS BY REGISTERED ENGINEERS SHOULD BE PERFORMED WHERE DEICING AND SNOW REMOVAL & STORAGE <br /> ROUTINE INSPECTION HAS REVEALED A QUESTION OF STRUCTURAL OR <br /> HYDRAULIC INTEGRITY AFFECTING PUBLIC SAFETY. <br /> THE USE OF CLEAN SAND MAY BE USED TO AID TRACTION IN <br /> LIST OF PERMITS & SPECIAL CONDITIONS CONJUNCTION WITH SALT AND/OR CHEMICALS FOR DEICING, SNOW <br /> MELTING AND OTHER RELATED WINTER WEATHER MANAGEMENT. SNOW <br /> SHALL BE SHOVELED AND PLOWED FROM SIDEWALK AND PARKING AREAS <br /> % THE PROJECT WILL RECEIVE SEVERAL PERMITS, WHICH MAY CONTAIN AS SOON AS PRACTICAL DURING AND AFTER WINTER STORMS. SAND <br /> o SPECIAL CONDITIONS THAT REQUIRE COMPLIANCE BY THE PROPERTY ACCUMULATION SHALL BE REMOVED FROM THE SITE AT THE END OF THE <br /> N OWNER AND MAINTENANCE CONTRACTORS. THESE PERMITS MAY INCLUDE WINTER SEASON OR APPROPRIATE TIME WHEN SEASONAL SNOW HAS <br /> o THE FOLLOWING: MELTED. ALTERNATIVE DEICING METHODS MUST BE SUBMITTED PRIOR TO <br /> 2 USE ONSITE FOR REVIEW TO THE CITY OF HOLYOKE FOR APPROVAL. <br /> o CITY OF STOCKTON PERMITS: <br /> DEMOLITION PERMIT <br /> w SNOW SHALL NOT BE STOCKPILED WITHIN THE 100' WETLAND SETBACK <br /> Q •• BUILDING PERMIT AREA OR IN THE DETENTION BASIN <br /> •• SITE PLAN REVIEW <br /> o SPILL CONTROL <br /> m <br /> i MAINTENANCE LOGS THE FOLLOWING PRACTICES WILL BE FOLLOWED FOR SPILL PREVENTION <br /> o THE PROPERTY OWNER WILL KEEP A RECORD OF ALL MAINTENANCE AND CLEAN—UP: <br /> a PROCEDURES PERFORMED, DATE OF INSPECTION/ CLEANINGS, ETC. <br /> COPIES OF INSPECTION REPORTS AND MAINTENANCE RECORDS SHALL BE MANUFACTURER'S RECOMMENDED METHODS FOR SPILL CLEAN—UP <br /> 0 <br /> N <br /> O <br /> N <br /> O <br /> M <br /> M <br /> . ARCHITECTURE DesiOPERATIONS AND MAINTENANCE NOTES Drawn ENGINEERING B.S.R. <br /> Reviewed S.M.K. OM <br /> _ <br /> ENVIRONMENTAL PROPOSED AIR CARGO FACILITY <br /> Scale NONE <br /> VkmLAND SURVEYING 4725 SOUTH B STREET Project No. 1902145 <br /> STOCKTON, CALIFORNIA Date 04/01/20 <br /> CW111:10'al" CAD File OM190214501 <br /> ©2020 BL COMPANIES,INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON,FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BE COMPANIES. <br />