Laserfiche WebLink
('�KLEIMFELDER <br /> Bright People.Right Solutions. <br /> May 11, 2020 <br /> Kleinfelder Project No: 20210067.001A <br /> Ms. Suzanne King, PE <br /> BL Companies, Inc. <br /> 220 Norwood Park South, Suite 201 <br /> Norwood, MA 02062 <br /> ski ng(a)blcompan ies.com <br /> SUBJECT: Geotechnical Investigation Report <br /> Stockton Airport Amazon Air Cargo <br /> South of Intersection of B Street and Earhart Avenue <br /> Stockton, California <br /> Dear Ms. King: <br /> The attached report presents the results of Kleinfelder's geotechnical investigation for the <br /> proposed Air Cargo Facility to be located within the current boundaries of the Stockton <br /> Metropolitan Airport (SCK), south of the intersection of B Street and Earhart Avenue in Stockton, <br /> California. The attached report describes the study, findings, conclusions, and recommendations <br /> for use in project design and construction. <br /> It is Kleinfelder's professional opinion that construction for the proposed project is geotechnically <br /> feasible using conventional earthmoving equipment and shallow spread foundation systems, <br /> provided settlement tolerances can be incorporated into the design. The presence of moderately <br /> to highly plastic clays are the main geotechnical issue of concern. Additionally, ground shaking <br /> due to regional earthquake activity is anticipated during the life of the project and should be <br /> considered in project design. Recommendations for use in design of foundations, site grading, <br /> pavements, and other geotechnical considerations are presented in this report and should be <br /> incorporated into project design and construction. <br /> Kleinfelder appreciates the opportunity to provide geotechnical engineering services during the <br /> design phase of this project. If there are any questions concerning the information presented in <br /> this report, please contact this office at your convenience. <br /> Respectfully submitted, <br /> ESS1C3, <br /> KLEINFELDER, INC. ,+ • H'f <br /> X3027 ' <br /> � �t*rc <br /> OFC <br /> James A. Wetenkamp, PG, CEG Steven J. Wiesner, PE, GE <br /> Project Engineering Geologist Principal Geotechnical Engineer <br /> 20210067.001A/ST020R111447 Page ii of iv May 11, 2020 <br /> ©2020 Kleinfelder www.kleinfelder.com <br /> KLEINFELDER 2001 Arch-Airport Road, Suite 100, Stockton, CA 95206 p 1209.948.1345 f 1209.234.4700 <br />