My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013454
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
B
>
4725
>
2600 - Land Use Program
>
PA-2000089
>
SU0013454
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2020 2:20:12 PM
Creation date
7/1/2020 12:38:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013454
PE
2635
FACILITY_NAME
PA-2000089
STREET_NUMBER
4725
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206-
APN
17726034
ENTERED_DATE
6/29/2020 12:00:00 AM
SITE_LOCATION
4725 S B ST
RECEIVED_DATE
6/26/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLE/NFELOER <br /> �Bright People.Right Solutions. <br /> The lime quality and spreading, mixing, and compacting operations should conform to Section 24 <br /> of the Caltrans Standard Specifications, latest edition. At least two to three days prior to spreading <br /> or mixing the lime, the moisture content of the underlying, untreated clay soil should be checked. <br /> If the soil moisture content is found to be dry of optimum, the soil moisture content should be <br /> raised using liberal sprinkling, flooding or another suitable method. <br /> Following lime treatment, the treated soil should be properly cured by continual sprinkling with <br /> water to keep the surface damp, combined with light rolling to keep the surface knitted together. <br /> The subgrade soils should be covered with at least two inches of Class 2 aggregate base within <br /> three days of lime treatment in an effort to reduce drying. Periodic sprinkling is still required to <br /> keep the surface damp. As an alternative, the treated soil could be cured as discussed in Section <br /> 24 of the Caltrans Standard Specifications. <br /> Although lime treatment has performed well for hundreds of developments in the general project <br /> area, isolated problems have occasionally occurred due to a lack of quality control during <br /> construction, swelling if the underlying, untreated clay is dry, and/or inadequate curing following <br /> lime treatment. Accordingly, these factors are considered critically important. Prior to earthwork <br /> operations, our firm should review the lime contractor's proposed treatment procedures. <br /> Laboratory tests should be performed at least two weeks prior to earthwork operation in order to <br /> assess or revise the required lime application rate. Also, a representative from our firm should be <br /> on-site during treatment operations to document spreading, mixing and compaction operations <br /> and provide supplemental/revised recommendations, if warranted, based on the soil conditions <br /> observed. <br /> 5.6.3 Capillary Break <br /> Groundwater should not rise near surface and adversely impact the structural performance of the <br /> floor slabs. In areas where the floor slabs will be covered with moisture-sensitive flooring, it has <br /> been common practice and industry standard in the project area to place a capillary break <br /> consisting of at least 4 inches of free draining crushed gravel on the finished subgrade soil that, <br /> in turn, is overlain by a flexible sheet membrane, such as Stego WrapTM, Moistop PIusTM, or an <br /> equivalent meeting the requirements of ASTM E1745, that serves as a water and/or moisture <br /> vapor retarder. The crushed gravel should be graded so that 100 percent passes the 1-inch sieve <br /> and less than 5 percent passes the No. 4 sieve. Care should be taken to properly place, lap, and <br /> seal the membrane in accordance with the manufacturer's recommendations to provide a vapor <br /> 20210067.001A/ST020R111447 Page 22 of 37 May 11, 2020 <br /> ©2020 Kleinfelder www.kleinfelder.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.