Laserfiche WebLink
N <br /> N <br /> Date Begin-End: 4/16/2020 Drilling Company: V&W Drilling BORING LOG B-8 <br /> c� <br /> Logged By: M.Porter Drill Crew: Frank/Anthony <br /> m Hor.-Vert.Datum: Not Available Drilling Equipment: CME-55 HT Hammer Type-Drop: 140 Ib.Auto-30 in. <br /> a Plunge: -90 degrees Drilling Method: Hollow Stem Auger <br /> 0 <br /> a <br /> 0 <br /> Weather: SunnyM/arm Exploration Diameter:6 in.O.D. <br /> FIELD EXPLORATION LABORATORY RESULTS <br /> O .. N U N <br /> o 0) Latitude:37Lu o .90245° a) J= „ o a o o N N <br /> Longitude:-121.24152° T ma � o c a <br /> O w Surface Condition:Soil H 3 Z,af <br /> U a) al C�ca3 a� p +- J O C i <br /> CL .r- L Q� Q O LL >Z U) O C C C C U z O <br /> Q U o m O I I 0 of (� w rn rn N II N <br /> a) O a7 7 a7 o c o (D (n T O O Z a7 a7 a7 d 'a N <br /> o c7 Lithologic Description co z U) mJ LL o? D Co U o 0- 0- a? Q of <br /> Fat CLAY(CH):high plasticity,brown,moist <br /> Very stiff BC=4 15' <br /> 1B 6 19.5 101.5 <br /> 1A 8 <br /> P=2.5 <br /> BC=5 12" <br /> 2B 6 <br /> 2A 12 <br /> 5 P=2.5 <br /> --------------fn�, 3BC=9 15" <br /> Lean CLAY(CL):medium plasticity,!�!r!moist,hard 18 <br /> P=4.5 <br /> GROUNDWATER LEVEL INFORMATION: <br /> The boring was terminated at approximately Groundwater was not observed during drilling or after <br /> 6.5 ft.below ground surface. The boring was completion. <br /> backfilled with cement/bentonite grout on April GENERAL NOTES: <br /> 10 16,2020. <br /> Z 15- <br /> 0 <br /> H <br /> Y <br /> U <br /> O <br /> H <br /> U) <br /> W <br /> Lu <br /> H <br /> J <br /> LL <br /> W <br /> U <br /> LL <br /> LL <br /> 20- <br /> 0 <br /> C7 <br /> O <br /> J <br /> J_ <br /> O <br /> U1 <br /> H <br /> a <br /> m <br /> Lu <br /> o tz <br /> z <br /> 25 <br /> o � <br /> o O <br /> m <br /> N JI <br /> Lu <br /> m <br /> � m <br /> Z J <br /> Z � <br /> H ' <br /> U N <br /> Lu o <br /> 30- <br /> 0 NI <br /> a_ <br /> m <br /> J <br /> ZZ <br /> Q <br /> r Z <br /> NI PROJECT NO.: BORING LOG B-S FIGURE <br /> �I 20210067.001A <br /> E Y <br /> iu <br /> w KLE/NFELOER DRAWN BY: GG A-10 <br /> YI< SCK Air Cargo Facility <br /> iL Bright People.Right Solutions. CHECKED BY: JW S. B Street and Earhart Avenue <br /> F, F- �� Stockton,Califonria <br /> F- z DATE: 4/27/2020 <br /> PAGE: 1 of 1 <br /> m m <br />