Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> 2009 STORMWATER QUALITY CONTROL CRITERIA PLAN <br /> VOLUME REDUCTION CALCULATOR (Update July 16, 2010) <br /> TIME STAMP Pqurry • <br /> vieTORMWATER <br /> 4c;FOR�`P "•��• o>o��� �" Working for YOU <br /> 10-Make sure that Macros are enabled while using the Calculator <br /> 11-This calculator is solely for the purposes of determining compliance with the Volume Reduction Requirement.This is not a substitute and should not be used to <br /> determine compliance with SQDV/SQDF or any other new development/redevelopment requirements. <br /> No-Volume Reduction is only given to Volume Reduction Measures and LID Treatment Controls.Volume Reduction is not given to Conventional Treatment Controls <br /> including wet ponds and proprietary controls. <br /> 10-The Calculator is intended as a companion to the SWQCCP and not to replace or be independent of it. Therefore all of the details contained within the SWQCCP are <br /> not contained within the calculator. <br /> Do-Instructions:Fill in the yellow boxes with the requested information.Numbers in the remainder of the boxes will be automatically filled out for you. <br /> >Each of the following worksheets will assist you in calculating the volume reduction achieved for Volume Reduction Measures and LID Treatment Controls.A <br /> worksheet must be filled out for each Volume Reduction Measure and LID Treatment Control(e.g.,if there are 3 Rain Gardens proposed on the site,3 Rain <br /> Garden worksheets must be filled out). <br /> >Once the information is filled out for the proposed Volume Reduction Measures and LID Treatment Controls,click in the red box below.This will run a macro <br /> that will sum up the volume reduction achieved by Volume Reduction Measures and LID Treatment Controls.NOTE to Mac Users:The Mac version of Excel may <br /> not be capable of running macros so you may have to manually sum up the volume reduction gained from Volume Reduction Measures and LID Treatment <br /> Controls. <br /> Project: Proposed Air Cargo Facility,4725 South B Street,Stockton,CA <br /> Detail: <br /> Design by: Benjamin S.Root <br /> Date: 2/7/2020 <br /> 1. PRE-PROJECT CHARACTERISTICS Notes <br /> a.Total Project Area,ft2(ApRE) 394652.0 Total Project Area must be entered first before any other <br /> calculations can be made <br /> b.Weighted Runoff Coefficient(CrPRE) 0.05 Go to"Cr Calcs"to calculate(orange tab) <br /> c.Volume Reduction Requirement storm depth,inches(d) 0.51 Avg.85th percentile,24-hour storm depth for Stockton area <br /> d.Significant Redevelopment Volume Reduction Credit,inches(Redev,redic) <br /> An additive credit of 0.05 inches is available for five types of redevelopment projects: <br /> -Siginificant Redevelopment(as defined in Section 2.1 of 2009 SWQCCP) -Credits are additive such that a maximum credit of 0.25 <br /> Brownfield redevelopment 0.00 inches is possible for a project that meets all five criteria. <br /> High density(>7 units/acre) New development projects are not eligible for the criteria. <br /> Vertical Density(FAR of 2 or>18 units/acre) <br /> Mixed use and Transit Oriented Development(within 1/2 mile of public transit) <br /> e.Revised Volume Reduction Requirement storm depth,inches(dmvised) 0.51 <br /> f.Pre-project Runoff Volume,ft3(VOIPRE) <br /> VOI PRE—(drevised ) PRE xrPRE <br /> /12 x A C 838.6 <br /> 2.POST-PROJECT CHARACTERISTICS Notes <br /> a.Total Project Area,ft2(AposT) 394652.0 <br /> b.Weighted Runoff Coefficient(CrPOST) 0.63 Go to"Cr Calcs"to calculate(orange tab) <br /> c.Volume Reduction Requirement storm depth,inches(d) 0.51 <br /> d.Significant Redevelopment Volume Reduction Credit,inches(Redevcredlc) <br /> An additive credit of 0.05 inches is available for five types of redevelopment: <br /> -Siginificant Redevelopment(as defined in Section 2.1 of 2009 SWQCCP) -Credits are additive Such that a maximum credit of 0.25 <br /> Brownfield redevelopment 0.00 inches is possible for a project that meets all five criteria. <br /> High density(>7 units/acre) -New development projects are not eligible for the criteria. <br /> Vertical Density(FAR of 2 or>18 units/acre) <br /> Mixed use and Transit Oriented Development(within 1/2 mile of public transit) <br /> e.Revised Volume Reduction Requirement storm depth,inches(dmvised) 0.51 <br /> f.Post-project Runoff Volume,ft3(VOIPOST) 10508.9 <br /> VOIPOST—(0.51/12)x ApOST x CrPOST <br /> VOLUME RUNOFF REDUCTION REQUIREMENT,ft3(VRR) <br /> 9670.2 <br /> POST— PRE <br /> VRR=Vol Vol <br />