Laserfiche WebLink
01 <br /> UNDERGROUND STORAGE TANK <br /> SPILL CONTAINER TESTING REPORT FORM (Page 1 of 1) <br /> Type of Action ❑ Installation Test ❑Repair Test ❑x 12 Month Test <br /> I. FACILITY INFORMATION <br /> CERS ID Date of Spill Container Test <br /> 10181455 11/20/2019 <br /> Business Name(Same as Facility Name or DBA-Doing Business As) <br /> Unified Grocers, Inc. <br /> Business Site AddressCity ZIP Code <br /> 1990 Piccoli Rd. Stockton 195215 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test(Print as shown on the/CC Certification.) Phone# <br /> PATRICK C.BANBURY (714)560-8222 <br /> Contractor/Tank Tester License# ICC Certification# ICC Certification Expiration Date <br /> 588098 5254955 12/17/2020 <br /> Spill Container Testing Training and Certifications(List applicable certifications.) <br /> INCON TS-STS 1001733709 ND y E D <br /> Ill. SPILL CONTAINER TESTING INFORMA I t� <br /> Test Method Used: 9Manufacturer Guidelines(Specify): INCON DEC Q 6 2019 <br /> INCON TS-STS <br /> ❑x Industry Code or Engineering Standard(Specify): RP-1200 HEALTHNVIRONMENTAI <br /> ❑Engineered Method(Specify): DEPARTMENT <br /> Attach the testing procedures and all documentation required to determine the results. #of Attached Pages 4 <br /> TANK ID:(By tank number,stored product,etc.) Diesel <br /> Spill Container Manufacturer: OPW <br /> Method of Cathodic Protection: ❑x Non-Metallic ❑Non-Metallic ❑Non-Metallic ❑Non-Metallic <br /> ❑ Isolation ❑Isolation ❑Isolation ❑Isolation <br /> ❑Other(Specify in V.) ❑Other(Specify in V) ❑Other(Specify in V.) ❑Other(Specify in V.) <br /> Inside Diameter of Spill Container:(Inches) 12" <br /> Depth of Spill Container:(Inches) 13.5" <br /> Does the spill container have a 5 gallon capacity? (]Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> Method to Keep Spill Container Empty: ❑x Drain Valve ❑Drain Valve ❑Drain Valve ❑Drain Valve <br /> ❑Onsite Pump ❑Onsite Pump ❑Onsite Pump ❑Onsite Pump <br /> ❑Other(Specify in V.) ❑Other(Specify in V.) ❑Other(Specify in V.) ❑Other(Specify in V) <br /> IV. SUMMARY OF TESTING RESULTS <br /> Spill Container Test Results: Z Pass ❑ Fail ❑ Pass ❑Fail ❑Pass ❑Fail ❑ Pass ❑Fail <br /> V. COMMENTS <br /> Any items marked"Fail'above must be explained in this section. Any additional comments may also be provided here. <br /> PER Unified Grocers put test water into truck wash down clarifier. <br /> Check If Action Items)Are Present <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> I hereby certify that the spill containers were tested in accordance with California Code of Regulations, Title 23, Division 3, <br /> Chapter 16,Section 2637.1 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> If the facility has more components than this form accommodates,additional copies of this page may be attached. <br /> CERS=Califomia Environmental Reporting System,ID=Identification,UST=Underground Storage Tank,ICC=Intemational Code Council <br />