Laserfiche WebLink
p �---- -- --� p o <br /> 1 1101 <br /> r Turbine O TurhlneO TurbineO r ^t <br /> Su'p Sump Sump I FLAT METAL <br /> I ANGLE IRON <br /> REQUIRED <br /> O TO SUSPEND <br /> I I PROBE a e <br /> (SIDE VIEW) <br /> r RECEPTACLES <br /> o <br /> 0 / Suw� FOR FOUR <br /> 0 / SCREW-IN,PROBE <br /> I I a o CABLE PLUGS <br /> El zo <br /> O I Tank Pad 0 0 <br /> TAPE I WEIGHT DOWN t� <br /> CABLE TO PREVENT <br /> QO 10 Feet-Min.Distance ACCIDENTAL O <br /> Per NFPA 30A MOVEMENT DURING <br /> LEAK TESTING TS-STS <br /> T (PROBE CABLE SUMP TEST SYSTEM <br /> PN:600.0200 SPLIT RINGo 0 o <br /> =50 FEET) POWER CORD <br /> WITH A GROUNDED <br /> SAFETYam <br /> 3-PRONGED <br /> CONES ` PLUG <br /> STS-PRB-12 <br /> LEAK TESTING <br /> GROUNDED PROBE WITH: <br /> 3 PRONG STAINLESS <br /> TSP-SSP <br /> EXTENSION ® <br /> STEEL FLOAT <br /> CORD RECID <br /> TS-STS <br /> SUMP TESTT <br /> SYSTEM <br /> TURBINE SUMP <br /> STP WITH TEST SOLUTION <br /> (Side View) <br /> BUILDING <br /> Figure l.3 Typical Leak Detection Probe—Turbine Sump Installation Figure L4 Leak Detection Probe Installation <br /> Overview Turbine Sump <br /> — •: — <br />