My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0070775
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
181
>
4100 – Safe Body Art
>
SR0070775
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2023 4:29:30 PM
Creation date
7/3/2020 10:13:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4100 – Safe Body Art
File Section
COMPLIANCE INFO
RECORD_ID
SR0070775
PE
4102
FACILITY_NAME
ONE SIXTEEN TATTOO
STREET_NUMBER
181
Direction
S
STREET_NAME
UNION
STREET_TYPE
RD
City
MANTECA
Zip
95337
APN
22208027
ENTERED_DATE
10/13/2014 12:00:00 AM
SITE_LOCATION
181 S UNION RD # 10
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\BA\BA_4120_PR0539655_181 S UNION_.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> GENERAL REVIEW <br /> 1. When a tattoo, permanent cosmetic, branding or piercing business is <br /> constructed or remodeled, plans and specifications for such construction, <br /> remodel or alteration shall be submitted to the Plan Review Unit of the Local <br /> Enforcement Agency (LEA). The local building official may require plans as <br /> well. California Health & Safety Code (CHSC) § 119312(f) <br /> A. Scaled drawing shall include a floor plan indicating the layout of procedure <br /> areas, cleaning and sterilization area, sink counters, storage areas, <br /> equipment and reception areas shall be submitted for review. See <br /> attached example floor plan <br /> B. Plan submissions shall include a finish schedule for sanitary walls, floors <br /> and ceiling as approved by the LEA. See attached example finish <br /> schedule <br /> C. All construction is to be done in accordance with approved plans. Approval <br /> by the LEA and all applicable permits must be obtained before <br /> commencing work. <br /> FACILITY CONSTRUCTION <br /> 1. General Premises <br /> A. Floors in the work areas and restroom shall be constructed of materials <br /> that are smooth, nonabsorbent, free of open holes and washable. CHSC <br /> §119314(a)(2) <br /> B. The walls in work areas shall be smooth, free of open holes and <br /> washable. CHSC §119314(x)(2) <br /> C. The premises shall be constructed and maintained to be free from insect <br /> or rodent infestation. CHSC §119314(x)(3) <br /> D. The facility must have adequate toilet facilities. The sink shall be supplied with hot <br /> and cold running water, containerized liquid soap, and single-use paper towels that are <br /> dispensed from a wall-mounted,touchless dispenser. All sinks shall be permanently <br /> plumbed and meet local building and plumbing codes. CHSC §119314(x)(5), CHSC <br /> §119314(b)(5), <br /> 2. Procedure Areas <br /> A. The procedure areas must be separated by a wall or ceiling-to-floor <br /> partition, from nail and hair activities. Body art can only be performed in <br /> the procedure area of the facility. CHSC §119314(b)(2) <br /> B. This area must be equipped with an accessible sink supplied with hot and <br /> cold running water, containerized liquid soap, and single-use paper towels <br /> that are dispensed from a wall-mounted, touchless dispenser that is <br /> accessible to the practitioner. All sinks shall be permanently plumbed and <br /> Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.