Laserfiche WebLink
9. Describe proposed General Plan (GP) amendments and/or prezoning/rezoning (Zoning) requests, if applicable: <br />Existing GP Designation Proposed GP Designation Acres Existing Zoning Proposed Zoning Acres <br />-Y-t: T I rJ<' To t I <br />10. Describe any site alterations which result from the proposed project: (Address the amount and location of grading, cuts and <br />fills, vegetation/tree removal, alterations to drainage, removal of existing structures, etc.) <br />11. Specific Project Description/Operational Characteristics: <br />a. Describe Proposed Commercial, Industrial, Institutional, and Recreational Uses (all non-residential uses): <br />Site Structure Required Parking <br />(1) Proposed Land Use(s) Zoning Acreage Sq. Ft• Parking Provided <br />Nf� <br />(2) Describe project phasing (location/timing): ldsw o'r'r 1 i <br />(3) Days/Hours of operation: Work shifts per day: 3 <br />(4) Total number of employees:,FOO ; Number of employees per work shift: 16 545- 25© VAP'I'sS <br />(5) Number of company vehicles/trucks: & <br />(6) Estimated number of vehicle trip ens (TE) per day generated by project: Trucks TE/Day; Passenger <br />Vehicles,? ., TE/Day; Total -73 "TE/Day. <br />(7) Estimated maximum number of TE/Day based on proposed General Plan Designation: TE/Day, and/or <br />Proposed Zoning: TE/Day <br />(8) Will land use -related noise produced on site exceed adopted noise standards (i.e.: 45 Leq dB during nighttime or <br />55 Leq dB during daytime hours at nearest residential property line; 75 Lmax dB at nearest commercial property <br />line; and/or 80 Lmax dB at nearest industrial property line)? <br />Yes ❑ No If yes, describe sources and levels of noise: <br />(9) Other operational or design characteristics: N A <br />f f/A b. escribe Proposed Residential Land Uses: [Check (V� or specify applicable types] <br />Co ntional 1-F ❑, 2-F❑, or 3-F ❑; PURD ❑; Condominiums ❑; Townhouses ❑ Apartments ❑; <br />Dormito ooming/Boarding Houses ❑; Elderly Apartments ❑; Residential Care Facility ❑; Employee Housing ❑; <br />Mobile Hom ; Motel/Hotel/B&B ❑; Extended Stay/Single Rm. Occupancy Facilities ❑; Other ❑ <br />(1) Residential La Use Summary: <br />Type of Unit Zonin Acrea a Proposed Units Units/Acre <br />(2) Describe Project Phasing: <br />(3) Population Projection for Proposed Project: _ <br />Projected Population Density (Persons/Unit): _ <br />(4) Student Generation Projected for Proposed Project: _ <br />Projected Student Density (K-12 Students/Unit): _ <br />(5) Estimated total number of vehicle trip ends (TE) per day generated by <br />Max. Units AllowedMax. Density <br />(6) Estimated maximum number of TE/Day based on proposed General Plan <br />Proposed Zoning: TE/Day <br />2 <br />project: _ <br />TE/Day, and/or <br />