Laserfiche WebLink
DEC -2B-95 fHU 12:26M ID:KSR STKN ENGINEERINU--IEL_NO:209 476-3291 #567 P013 <br />n <br />Every San -I -Pak unit is equipped with a calibrated 24 hour <br />chart r6corder to record the time and temperature of every <br />load Processed. These removable <br />acharts are placed on file <br />as legl proof Of cycle proficiency. <br />K.F.H. Staff Will initial the back of each chart and note <br />any anomaly. Staff Will be inscrViced and trained. This <br />training will be documented and kept on file in the <br />Facility Service Center. <br />The Mitsubishi Melsec F2-60 Controller is Programmed no <br />to allow, under any circumstances, material in theater' <br />liZation ch--mber to be discharged unless subjected to at <br />as275 degrees F for 35 mintures, I <br />/ <br />C- <br />1�—JZ -1 <br />William G. Be Strom <br />7;KR�obert B. Co <br />099= <br />