Laserfiche WebLink
0 <br />El <br />ENVIRONMENTAL SERVICES DEPARTMENT <br />TITLE <br />VERIFICATION OF STERILIZATION <br />01179-105 (12-89) <br />EFFECTIVE DATE <br />12/14/95 <br />PAGE NUMBER <br />2 OF 2 <br />REVISION DATE ... <br />Every San -I -Pak unit is equipped with a calibrated 24 hour <br />chart recorder to record the time and temperature of every <br />load processed. These removable charts are placed on file <br />as legal proof of cycle proficiency. <br />K.F.H. Staff will initial the back of each chart and note <br />any anomaly. Staff will be inserviced and trained. This <br />training will be documented and kept on file in the <br />Facility Service Center. <br />* The Mitsubishi Melsec F2-60 Controller is programmed not <br />to allow, under any circumstances, material in thesteri- <br />lization chamber to be discharged unless subjected to at <br />least 275 degrees F for 35 mintures. <br />�a a w�:sig► ��.u:iy <br />UIA'� 4e-� <br />William G. Be strom <br />Robert E. Co <br />