My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1994-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
305
>
4400 - Solid Waste Program
>
PR0504176
>
COMPLIANCE INFO_1994-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:33:24 AM
Creation date
7/3/2020 10:34:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994-2017
RECORD_ID
PR0504176
PE
4430
FACILITY_ID
FA0006106
FACILITY_NAME
MANTECA CITY DUMP
STREET_NUMBER
305
Direction
N
STREET_NAME
UNION
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20015001
CURRENT_STATUS
01
SITE_LOCATION
305 N UNION RD
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4430_PR0504176_305 N UNION_1994-2017.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Riverside <br /> <br /> 5 <br />the estimated settlement and will require repair. It should be noted that the added settlement for <br />the proposed project is less than 1 foot out of the remaining 12 feet of settlement. <br />6 SOLAR PROJECT CONSTRUCTION CQA <br />A Construction Quality Assurance Program (CQA) will be implemented during construction. It <br />is recommended that a third party CQA Representative, hired by SEI, observe and document the <br />solar array installation. To assure that the cover will not be damaged during construction of the <br />solar arrays, the following CQA program measures will be implemented. <br />Pre-Construction – A pre-construction meeting will be held between SEI, the CQA <br />Representative, and the County to review the project installation process and expectations. SEI <br />will submit documents which describe the installation equipment and procedures as well as the <br />measure to be taken if damage to the landfill cover is identified by the CQA Representative. <br />Damage is defined as disturbance of the existing soil cover of more than 1-inch of depth. Repair <br />is defined as placement of soil or grading to restore the existing cover surface material in <br />accordance with the closure CQA Plan, page 275 of this PDF, and Specifications (Earth <br />Technology Corporation, 1993), page 209 of this PDF. <br />Construction – The CQA Representative (under the direction of a California certified <br />Professional Engineer or Geologist) will be present onsite full-time during earth work. Since the <br />solar work is on the surface of the cover and visible, full-time observation by the CQA <br />Representative will not be necessary. An initial topographic survey and post-construction <br />topographic survey will be performed by SEI to document construction settlement. The CQA <br />Representative will approve, observe, and document preparation and placement of the solar <br />arrays, associated equipment, and connecting wiring. Problems with the work will be discussed <br />with SEI and the County at meetings held as necessary to present the problems and implement <br />their correction. Weekly construction progress reports will be prepared by CQA and forwarded <br />to regulatory agencies upon request. The reports will consist of visual observation and a <br />photographic record created and maintained by the CQA Representative. <br />Post-Construction – SEI, the County, the regulatory agencies, and the CQA Representative will <br />conduct a post-construction inspection of the completed solar installation. Problems and repairs <br />will be identified and added to a punch list for SEI to complete. The CQA Representative will <br />verify completion of the punch list and will prepare a certification report documenting the earth <br />work and solar array installation. <br />7 COVER MAINTENANCE DURING CONSTRUCTION <br />During construction, drainage and cover maintenance will be performed by SEI. The drainage <br />and cover features for the landfill are shown on Figure 5. Drain pipes and surface ditches will <br />be inspected on an ongoing basis, in accordance with the construction SWPPP, for signs of <br />silting or blockage and will be cleaned when access to the location allows. SEI shall protect in
The URL can be used to link to this page
Your browser does not support the video tag.