Laserfiche WebLink
County of Riverside <br /> <br /> 10 <br />Grass associated with the solar arrays will be controlled by periodic mowing beneath the solar <br />arrays. Arrays will be best maintained by using a manual weed trimming type of device that <br />allows selective grass removal in planter areas and near the support footings of the solar arrays. <br />Annual mowing in early summer after plants turn brown will be coordinated with the County and <br />implemented at minimum. <br /> <br />9.3 DRAINAGE SYSTEM <br />27 CCR 21090(b)(3), 20365, and 21150 <br /> <br />A supplemental maintenance program will be implemented by SEI, and verified by the County, <br />to maintain the integrity and effectiveness of the final drainage system in accordance with the <br />post-closure maintenance plan and RWQCB Order No. 98-99-02. The final drainage system will <br />be inspected and evaluated on an ongoing basis for: <br /> <br /> Evidence of erosion <br /> Standing water <br /> Formation of gullies <br /> Settlement, blockage, and damage to drainage channels, structures, swales, and <br />culverts <br /> <br />Damage to the drainage system will be promptly addressed under direction and to the satisfaction <br />of the County. Cause(s) for the damage will be reported in writing in the record of maintenance <br />activities prepared by SEI and submitted to the County per Section 9.2.1. <br />Permanent repairs and restoration will be made consistent with final closure construction <br />specifications. Temporary repairs may be utilized until permanent repairs can be scheduled. <br />Culverts and inlet and outlet structures will be cleaned of sediment regularly before their flow <br />capacities are impaired. Drainage inlet grates will be kept free of debris, and drainage channels <br />will be maintained to permit free flow. Maintenance & methodologies for repairs and restoration <br />will be consistent with the final cover and drainage system construction specifications. Cause(s) <br />for the damage will be reported in writing in the record of maintenance activities prepared by <br />Stronghold and submitted to the County and regulatory agencies. <br /> <br />Results of the inspection and summary of maintenance performed will be compiled by SEI and <br />included in the monthly monitoring report following the inspection. <br /> <br />9.4 LANDFILL GAS MONITORING AND CONTROL SYSTEMS <br />27 CCR 20921 et seq. and 21180 (a)(2) <br /> <br />The LFG migration monitoring system will be inspected on an ongoing basis, consistent with the <br />requirements and 27 CCR 20933. System components will be repaired and replaced as required <br />to maintain full system capabilities, as intended at initial installation. <br />