Laserfiche WebLink
County of Riverside <br /> <br /> 14 <br /> <br />Key: A Available Stronghold staff and equipment <br /> B Available from local fire response facilities <br /> C Inspection available in less than 12 hours <br /> D Availability dependent on type of mitigation measure <br /> <br /> <br />Table 9-3. Post-closure Inspection Schedule <br /> <br />Activities Ongoing3 Monthly4 Quarterly Semiannually1 <br /> <br />Final cover areas <br />Drainage system <br />Paved cover <br />Landfill gas monitoring system <br />Security <br />Emergency response events <br /> <br /> <br />X <br />X <br /> <br />X <br />X <br /> <br /> <br /> <br /> <br /> <br /> <br />X <br />X <br />X <br />X <br /> <br /> <br /> <br /> <br /> <br />X <br />X <br />X2 <br />X <br />X <br />X <br /> <br /> <br />X <br />X <br />X <br /> <br />X <br />X <br /> <br /> <br />1 - Comprehensive inspection conducted by the RPs <br />2 - Quarterly during the first year <br />3 – When accessible <br />4 – At minimum monthly during the first year <br /> <br /> <br /> <br />For each inspection, any damage discovered and repairs should be documented and included in <br />the monthly monitoring report following the inspection. Photographs should also be taken of the <br />damage and the photographs labeled with the location of the damage and the time and date taken. <br /> <br />10 MAINTENANCE COST ESTIMATES <br />This section presents the supplemental maintenance cost estimates and associated supporting <br />documentation for the solar arrays at West Riverside Landfill. The cost estimates were prepared <br />consistent with 27 CCR, Sections 21780(a)(2). <br /> <br />10.1 MAINTENANCE COST ESTIMATE <br />27 CCR 21840 and 21769(b)(2)(A) <br /> <br />The maintenance cost estimate was prepared by SCS Engineers based on the activities described <br />in this Maintenance Plan. The maintenance cost estimate includes the cost of materials, <br />equipment, labor and administration. <br />