My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
4400 - Solid Waste Program
>
PR0504187
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2020 9:27:34 AM
Creation date
7/3/2020 10:34:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0504187
PE
4430
FACILITY_ID
FA0006111
FACILITY_NAME
SHARPE ARMY DEPOT
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
CField
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4430_PR0504187_850 E ROTH_.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I V. Surface Condit -is <br />A. Is site access adequately restricted". 1- <br />B Is - the waste adequately covered to prevent human contact? <br />C is the final drainage system for the site adequate to prevent erosion? <br />(Y/N) v L- <br />D. Is the final grading adequate to promote run-off? (Y/N) <br />E. Are slopes greater than 3:1 (33% or 18 degrees)? /V 0 are <br />F. Are slopes greater than 1.75:1 (57% or 30 degrees)? <br />V. Postclosure Land Use <br />A. Has the land use of the site significantly changed since Closure? <br />(YCN_J), <br />If yes, include, or reference site improvement plans and answer the following: <br />1. Give the date that the improvements were constructed <br />2. Have the improvement compromised the integrity of the final <br />cover'? (Y/N/NA) . ) 7A <br />3. Has differential settlement affected the improvements? (Y/N) <br />B. Is there a proposed change in postclosure land use that may jeopardize <br />the integrity of previously closed sites or pose a potential threat to public <br />health and safety or the environment? A <br />— If yes, briefly describe the proposed project: <br />— <br />� ) 4 - " - o 4 L �, " <br />C Is there a postclosure land use tracking system? (Y*' <br />If yes, describe tracking system: is oto L,tj dd rnn <br />V1. Disposal Site Priority (See Prioritization Chart) <br />All: A2: A 3:_ B1: B2:—B 3-. C1: C2: C 3:_ D <br />N"EM-07101MMI'M =1 <br />COMPLIANCE BRANCH REVIETT: <br />CIWMB CLOSURE AND REMEDIATION BRANCH APPROVAL: <br />Page 4 of 4 <br />ClWMB Closure and Remediation Branch (1/25193) <br />
The URL can be used to link to this page
Your browser does not support the video tag.