0 9
<br /> CalRecycle
<br /> Closed Disposal Site Inspection Report (188)
<br /> clef4e yt y L a
<br /> �llllopIWIumCounty of San Joaquin
<br /> �. ., , �_,...... +4s,•.�,,. �.�: � �� `aV ,ji,#:,"""r. I. �"ir^�t''. .. y ;, t�lY:y�;^�II�q II ��I �91:N:1,"II�IIII�17Ili Ilh'ry�ha u�� r e d y�xj"„,-"'#
<br /> 39-CR-0022 12/5/2012 LEA Periodic
<br /> T��, t Irtl II11I to #' R. � 3.�x:"KY i@ i n IVIIVII I'
<br /> µrr ma,,%u� II,IIVal:lhl It � > . ir � lll�ll 111 IIIIIII IIIIIIIII
<br /> I.:i2'1.u a;:,.a;,.,..,. .,,.,.,.I tlI.I hIr� 1I.ma,
<br /> lIiII,lI,�„uy;.p,,,,rs
<br /> :...
<br /> Pilkington North America, Inc. Libbey-Owens Ford
<br /> .a,:;": ?gr"�a y"?,�c,�xs?::
<br /> � ter"�sas�'"` �
<br /> i„���.r•»W .r. �,«x/,v,„five .: ....�. >*a#'wtt:,.a Y .u�l „III lhldiul,l
<br /> 500 E Louise Ave., Lathrop,ca, Lathrop
<br /> 95330
<br /> n
<br /> �. !a�� 114 1 ,%
<br /> -s
<br /> :., ., ,
<br /> Alfonso Arambula
<br /> THE ABOVE FACILITY WAS INSPECTED FOR COMPLIANCE WITH APPLICABLE SECTIONS OF THE DIVISION 30 OF THE PUBLIC RESOURCES CODE(PRC)AND TITLE 14 AND TITLE 27 CALIFORNIA CODE OF REGULATIONS(CCR)
<br /> al
<br /> NOW
<br /> X 20820 - Drainage and Erosion Control
<br /> Comments: Photos taken onsite show glass waste, metal waste, plastic waste from the manufacturing of glass
<br /> and, wood waste on the surface of the ground. Minimum state standards are not being met because of the
<br /> exposed waste. The majority of the exposed waste is located about 200 ft south of the southern Pilkington
<br /> perimeter fence. Weather conditions have caused soil erosion and new waste has surfaced onto the ground.
<br /> -This section requires that Drainage and Erosion controls be in place and maintained to:
<br /> (1)ensure integrity of roads, structures, and gas monitoring and control systems;
<br /> (2)* prevent safety hazards; and
<br /> (3)*prevent exposure of waste.
<br /> -Photos taken document water ponding over waste. Application of the soil cover must coincide with proper
<br /> compaction and grading. Depressions that allow water to pond can diminish the cover and allow waste to
<br /> surface.
<br /> - Prior to any development onsite the EHD must be notified and a site investigation to determine the extent of the
<br /> waste must be made.
<br /> - Facility contact Ben Cuthbertson informed the EHD that progress towards applying soil cover onsite is still
<br /> awaiting bid approval from Corporate.
<br /> A Quarterly Inspection was conducted on this date.
<br /> Notes:
<br /> 1.)Access onto the site from Murphy Rd is restricted. Keys to obtain access to this site can be obtained from a guard
<br /> shack located at the entrance of the Pilkington facility located on 500 E. Louise Ave. Facility contact Ben Cuthbertson
<br /> should be contacted prior to site visit.
<br />
|