Laserfiche WebLink
0 9 <br /> CalRecycle <br /> Closed Disposal Site Inspection Report (188) <br /> clef4e yt y L a <br /> �llllopIWIumCounty of San Joaquin <br /> �. ., , �_,...... +4s,•.�,,. �.�: � �� `aV ,ji,#:,"""r. I. �"ir^�t''. .. y ;, t�lY:y�;^�II�q II ��I �91:N:1,"II�IIII�17Ili Ilh'ry�ha u�� r e d y�xj"„,-"'# <br /> 39-CR-0022 12/5/2012 LEA Periodic <br /> T��, t Irtl II11I to #' R. � 3.�x:"KY i@ i n IVIIVII I' <br /> µrr ma,,%u� II,IIVal:lhl It � > . ir � lll�ll 111 IIIIIII IIIIIIIII <br /> I.:i2'1.u a;:,.a;,.,..,. .,,.,.,.I tlI.I hIr� 1I.ma, <br /> lIiII,lI,�„uy;.p,,,,rs <br /> :... <br /> Pilkington North America, Inc. Libbey-Owens Ford <br /> .a,:;": ?gr"�a y"?,�c,�xs?:: <br /> � ter"�sas�'"` � <br /> i„���.r•»W .r. �,«x/,v,„five .: ....�. >*a#'wtt:,.a Y .u�l „III lhldiul,l <br /> 500 E Louise Ave., Lathrop,ca, Lathrop <br /> 95330 <br /> n <br /> �. !a�� 114 1 ,% <br /> -s <br /> :., ., , <br /> Alfonso Arambula <br /> THE ABOVE FACILITY WAS INSPECTED FOR COMPLIANCE WITH APPLICABLE SECTIONS OF THE DIVISION 30 OF THE PUBLIC RESOURCES CODE(PRC)AND TITLE 14 AND TITLE 27 CALIFORNIA CODE OF REGULATIONS(CCR) <br /> al <br /> NOW <br /> X 20820 - Drainage and Erosion Control <br /> Comments: Photos taken onsite show glass waste, metal waste, plastic waste from the manufacturing of glass <br /> and, wood waste on the surface of the ground. Minimum state standards are not being met because of the <br /> exposed waste. The majority of the exposed waste is located about 200 ft south of the southern Pilkington <br /> perimeter fence. Weather conditions have caused soil erosion and new waste has surfaced onto the ground. <br /> -This section requires that Drainage and Erosion controls be in place and maintained to: <br /> (1)ensure integrity of roads, structures, and gas monitoring and control systems; <br /> (2)* prevent safety hazards; and <br /> (3)*prevent exposure of waste. <br /> -Photos taken document water ponding over waste. Application of the soil cover must coincide with proper <br /> compaction and grading. Depressions that allow water to pond can diminish the cover and allow waste to <br /> surface. <br /> - Prior to any development onsite the EHD must be notified and a site investigation to determine the extent of the <br /> waste must be made. <br /> - Facility contact Ben Cuthbertson informed the EHD that progress towards applying soil cover onsite is still <br /> awaiting bid approval from Corporate. <br /> A Quarterly Inspection was conducted on this date. <br /> Notes: <br /> 1.)Access onto the site from Murphy Rd is restricted. Keys to obtain access to this site can be obtained from a guard <br /> shack located at the entrance of the Pilkington facility located on 500 E. Louise Ave. Facility contact Ben Cuthbertson <br /> should be contacted prior to site visit. <br />