Laserfiche WebLink
0 <br /> CalRecycle 0 <br /> Closed Disposal Site Inspection Report (188) <br /> nfarc 'n7 �,ce G County of San Joaquin <br /> 39-CR-0022 3/12/2013 LEA Periodic <br /> 4.a;�a`�c#-{..�xx;., ,• �z,�1 trw,„�',�.` '�.,e:;' ��� ,••a i,z �yyr; <br /> Pilkington North America, Inc. Libbey-Owens Ford <br /> 500 E Louise Ave., Lathrop,ca, Lathrop <br /> 95330 <br /> � /#Ic Present ggrnej, �> F, ; a �� <br /> { <br /> Alfonso Arambula Ben Cuthbertson <br /> THE ABOVE FACILITY WAS INSPECTED FOR COMPLIANCE WITH APPLICABLE SECTIONS OF THE DIVISION 30 OF THE PUBLIC RESOURCES CODE(PRC)AND TITLE 14 AND TITLE 27 CALIFORNIA CODE OF REGULATIONS(CCR) <br /> &.O�s,l° ,� t k ,�` ,. i a � c ;� � s xr=-•a�'a p ay ,�rflotatlons C�A�48iCfilCerll <br /> ,.. wk:xsu3t, <br /> x 20820 - Drainage and Erosion Control <br /> Comments: Photos taken onsite show glass waste, metal waste, plastic waste from the manufacturing of glass <br /> and, wood waste on the surface of the ground. Minimum state standards are not being met because of the <br /> exposed waste. The majority of the exposed waste is located about 200 ft south of the southern Pilkington <br /> perimeter fence. Weather conditions have caused soil erosion and new waste has surfaced onto the ground. <br /> -This section requires that Drainage and Erosion controls be in place and maintained to: <br /> (1)ensure integrity of roads, structures, and gas monitoring and control systems; <br /> (2)”prevent safety hazards; and <br /> (3)*prevent exposure of waste. <br /> -The Environmental Health Department(EHD)held a meeting on February 8, 2013 with Pilkington <br /> representatives Kyle Sword, Ben Cuthbertson, Cliff Fleener, Pamela Rygalski and a consultant Donald Pinkerton <br /> of Antea Group. The EHD provided clarification on why corrective action is required and our expectation for a <br /> reasonable schedule. Pilkington representatives agreed to submit a schedule to the EHD. <br /> - On March 21, 2013 the EHD recieved a schedule from Pilikington detailing progression towards corrective <br /> action. The Schedule is listed below: <br /> Historical Review/Area Delineation/Consultant Work Plan generation February 21, 2013 to March 25, 2013 <br /> Lathrop Team/Consultant/Corporate Review&Concurrence March 25, 2013 to April 26, 2013 <br /> Submit Proposal to SJEHD for Sign off April 26, 2013 to May 26, 2013 <br /> IWe�•�t4!� <br /> A Quarterly Inspection was conducted on this date. <br /> Notes: <br /> 1.)Access onto the site from Murphy Rd is restricted. Keys to obtain access to this site can be obtained from a guard <br /> shack located at the entrance of the Pilkington facility located on 500 E. Louise Ave. Facility contact Ben Cuthbertson <br /> should be contacted prior to site visit. <br />