Laserfiche WebLink
I V. Surface Conditio <br /> A. Is site access adequately restricted�. (Y/N) <br /> B. Is the waste adequately covered to prevent human contact? <br /> C. Is the final drainage system for the site adequate to prevent erosion? <br /> (Y/N) wo s k ,c cx� f'n�-C/ le oe' <br /> D Is the final grading adequate to promote run-off? (Y/N) <br /> E. Are slopes greater than 3:1 (33% or 18 degrees)? (Y/ A)c <br /> F. Are slopes greater than 1.75:1 (57% or 30 degrees)? (YJ <br /> V. Postclosure Land Use <br /> A. Has the land use of the site significantly changed since Closure? <br /> (Y <br /> If yes, inc ude or reference site improvement plans and answer the following: <br /> 1. Give the date that the improvements were constructed <br /> 2. Have the improvements compromised the integrity of the final <br /> cover? (Y/N/NA) tJ1,4 <br /> 3. Has differential settlement affected the improvements? (Y/N)_.�' <br /> B. Is there a proposed change in postclosure land use that may jeopardize <br /> the integrity of previously closed sites or pose a potential threat to public <br /> health and safety or the environment? 0 O/N <br /> If yes, briefly describe the proposed project: <br /> C Is there a postclosure land use tracking system? ("(/N)) <br /> If yes, describe tracking system: /tj <br /> V1. Disposal Site Priority (See Prioritization Chart) <br /> A 1: A 2:—A 3: B 1:—B 2:—B 3: C1: C2: *,"'C3: ...__ D: <br /> V11. Comments <br /> elcx- <br /> V' C­ <br /> ATE: <br /> PREPARED BY: <br /> COMPLIANCE BRANCH REVIEW: <br /> CIWMB CLOSURE AND REMEDIATION BRANCH APPROVAL: <br /> Page 4 of 4 <br /> ClWMB Closure and Remediation Branch(1/25/93) <br />