Laserfiche WebLink
1 <br /> California Integrated Waste Management Board <br /> State of California <br /> "" Addendum TO Inspection Report <br /> CIMB 03 <br /> ••••a•�-• Page _ of 01(Rev 01/07) <br /> Enforcement Agency:,San Joaquin County Environmental Health Department 1 For Official CIWMB Use Only <br /> Received Date <br /> FACILITY FILE NUMBER (99-xx-9999) INSPECTION DATE(MM/DD/YYYY) <br /> 3 9 — A A — 0 0 1 1 1 0 / 0 2 / 2 0 0 8 <br /> Facility Name <br /> Escalon City Dump <br /> Facility Location 0Attachments On File(Not Scanned) <br /> 25100 E River Road, Escalon <br /> Inspector Inspector gnature <br /> Jenni Frase <br /> Comments: <br /> 1. violation- San Joaquin County Ordinance Division 9 Title 5 Chapter 1-Sewage Sludge-Analysis of soil samples taken during the site <br /> Investigation on 3/21/08 was received from JL Analytical Services and reviewed.The sampled material appears to be consistent with sewage sludge <br /> that is generated from waste water treatment ponds on site.Historical records indicate that in 1993 buried waste and sludge was moved to this <br /> location from another location on the site during wastewater treatment pond construction.Per operator sludge is currently spread to dry and disced <br /> back into bottom of pond. <br /> San Joaquin County Ordinance Division 9 of Title 5 Chapter 1 prohibits the land spreading or land discharge of sewage sludge or septage <br /> in the unincorporated area of San Joaquin County.Within 30 days of receivingthis is reportprovide to the Department written plans for <br /> properposal of sewage sludge and obtain proper documentation of disposal for review by the Department <br /> 2. violation- California Code of Regulations Chapter 34 Article 1 §67386.11(b)-Disposal-Railroad ties(Treated Wood Waste)that were <br /> excavated on 4/04/08 are stored on site 8"off ground and covered with a tarp.Obtain proper documentation of disposal and provide a copy to the <br /> Department for review. <br /> Provide to the Department plans for proper disposal of Treated Wood Waste within 30 days of receiving this reportAll activity concerning <br /> the TWW will be done under supervision of the Department <br /> Notes: <br /> 1.Proposed Police Firing Range project has not been completed. <br /> 2.Copies of Regulations noted to be in Violation above were distributed at time of inspection report. <br /> All <br /> INSTRUCTIONS ON BACK Corrects Incorrect: EXAMPLE 1 2 3 <br /> op VV#tite ti Middle Pink-LEA Bottom-Yellow <br />