Laserfiche WebLink
INFORMATION SHEET <br /> JOHNS-MANVILLE MANUFACTURING, INC., -2- <br /> JOHNS-MANVILLE ASBESTOS/CEMENT PIPE CORPORATION <br /> AND FORMOSA PLASTICS, USA <br /> SAN JOAQUIN COUNTY <br /> In Phase III, the portion of the channel that runs through the Johns-Manville property would <br /> be replaced by a stormwater pipe. The pipe would isolate the stormwater flows from <br /> contaminated sediments that may be present in the channel. If sediments downstream from <br /> Johns-Manville discharge point exceed the water quality goal, then remediation of <br /> downstream sediments may be required. Johns-Manville may decide to forgo the phased <br /> approach, proceed directly to install a stormwater pipe to replace the channel. <br /> An Engineering Feasibility and Corrective Action Program, which will detail the proposed <br /> approach, is due on 1 April 1994. Implementation of corrective action is scheduled for the <br /> summer of 1994. <br />