Laserfiche WebLink
I V. Surface Conditia <br /> A. Is site access adequately restricted? &N) <br /> B. I the waste adequately covered to prevent human contact? <br /> N) <br /> C. I the final drainage system for the site adequate to prevent erosion? <br /> D. Is the final grading adequate to promote run-off? (Y6 <br /> E. Are slopes greater than 3:1 (33% or 18 degrees)? (Y/N) V <br /> F. Are slopes greater than 1.75:1 (57% or 30 degrees)? (Y/N) <br /> V. Postclosure Land Use <br /> A. Hah land use of the site significantly changed since closure? <br /> (Y/0 <br /> , 'e <br /> ) I <br /> If yes, include or reference site improvement plans and answer the following: <br /> 1. Give the date that the improvements were constructed <br /> 2. Have the improvements compromised the integrity of the final <br /> cover? (Y/N/NA) <br /> 3. Has differential settlement affected the improvements? (Y/N) <br /> B. Is there a proposed change in postclosure land use that may jeopardize <br /> the integrity of previously closed sites or pose a potential threat to public <br /> health and safety or the environment? (Yo <br /> If yes, briefly describe the proposed project: <br /> C. Is there a postclosure land use tracking system? (Y <br /> If yes, describe tracking system: <br /> VI. Disposal Site Priority (See Prioritizatir)n Chart) <br /> A 1:—A 2:—A 3: B 1:—B 2:—B 3: C 1:—C 2:—C 3:_ D <br /> V11. Comments <br /> PREPARED BY: &I DAT <br /> COMPLIANCE BRANCH REVIEW: <br /> CIWMB CLOSURE AND REMEDIATION BRANCH APPROVAL: <br /> Page 4 of 4 <br /> ClWMB Closure and Remediation Branch (1/25M) <br />