Laserfiche WebLink
PROBE CONSTRUCTION LOG <br /> Probe No- L)(.r" 1 Pc <br /> Site C.,Ck I Project 140- '70.y S? C)C- Date 12,91Y& <br /> Drilling Contractor. Log by D. <br /> DTUMISIONS <br /> A. Total depth of boring 9 ft. <br /> D <br /> 1. B- Diameter of boring V--k in. ft Diameter of probe casing. V:?- in_ <br /> D. Height of casing above grade <br /> ft. <br /> E. Depth of casing below grade <br /> ft. <br /> P. Perforated casing interval /A <br /> From q ft_ to t. <br /> G. Permeable material interval <br /> from ft. to ft. <br /> R. impermeable plug interval <br /> from ft. to ft. <br /> X. Backfill interval A <br /> from ft. to ft. <br /> MATERIALS <br /> Permeable material <br /> Impermeable plug <br /> RackftlJ material <br /> Casing material .6 jr.- <br /> Re <br /> CONSTRUCTION <br /> method of fill placement <br /> MetfioZ1 of: casing placement <br /> d <br /> PAM U- T 0,-Iu C 1 4' <br /> Comments <br /> ,' Mandeville & Associates 526 Hofgaarde'n, City of Industry, CA 91744 <br /> rev <br />