Laserfiche WebLink
n KLEINFELDER <br /> be purged from the well until the discharge runs relatively clear of fines. Approximately <br /> five to ten well volumes will be removed from.each monitoring well. <br /> To reduce the potential for introducing contamination, the developing equipment will be <br /> dashed in a non-phosphate solution and rinsed in distilled water prior to use in the <br /> monitoring well. mater produced during development will be containerized in 55-gallon <br /> drums and will become the responsibility of Pintail,Inc. <br /> Saml2lina <br /> The aquifer will be allowed to equilibrate.for at Ieast 48 hours after development. The well <br /> will then be purged and sampled_ <br /> Purging and sampling will be performed with a QED bladder pump. During the purging of <br /> the well; field parameters (pia,conductivity, and temperature)will be monitored. Samples <br /> will be collected after field parameters have stabilized and at least 5 well-volumes of water <br /> have been removed from. the well. Samples will be collected in appropriate sterile and <br /> IW <br /> preserved containers supplied by the analytical laboratory. The sample containers will then <br /> immediately be sealed, labeled,. and placed in an iced cooler. At the end of the day, one <br /> water sample from the well will be delivered under chain-of custody to the analytical <br /> laboratory for analysis of. <br /> o Volatile Organic Compounds by EPA,Methods 601 and 602 <br /> o Metals by ICAP <br /> o Mercury,Selenium,and Arsenic by AA <br /> o General Minerals <br /> 3.3 ASSESSMENT OF SURFACE WATER <br /> Two water samples will be collected from the Mokolumne River to assess surface water <br /> quality. One sample will be collected upgradient of'the landfill (under the Southern Pacific <br /> Railroad bridge) and one sample will be collected at the downgradient (southeast) corner <br /> of the landfill. <br /> The temperature,pH, and electrical conductivity of the water at the sample location will be <br /> measured. Prior to collecting each sample, all sampling equipment will be decontaminated <br /> 137-38-:1663 8 <br />