My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AWANI
>
0
>
4400 - Solid Waste Program
>
PR0504218
>
ARCHIVED REPORTS_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 10:55:13 AM
Creation date
7/3/2020 10:35:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011
RECORD_ID
PR0504218
PE
4430 - SOLID WASTE CIA SITE
FACILITY_ID
FA0006126
FACILITY_NAME
CITY OF LODI LANDFILL
STREET_NUMBER
0
Direction
N
STREET_NAME
AWANI
STREET_TYPE
DR
City
LODI
Zip
95240
APN
04125038
CURRENT_STATUS
Active, billable
SITE_LOCATION
N AWANI DR
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4430_PR0504218_0 N AWANI_2011.tif
Site Address
N AWANI DR LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 13 FE 382-063--00 <br /> dead- plus- live loads . The bearing values may be increased by <br /> one-- third for short duration wind or seismic loads . These <br /> recommendations assume the foundations will be bearing in the <br /> engineered fill 'or gravel fill, and the fill has been placed a.s <br /> recommended in this report. <br /> Footings should have a minimum width of 18 inches regardless <br /> of load. The total and differential settlement is not expected <br /> to exceed the tolerable limits of the structure provided the <br /> foundations are not exposed to sustained standing water or <br /> f looding. <br /> Due to th-e loose nature of the material .encountered <br /> sloughing of -the. side walls may occur . This cobd..ition may <br /> AdOlk <br /> require sloping of the side walls . If' the excavation is <br /> backfilled with a 3/4-inch maximum aggregate, some gravels may be <br /> lost due to loose soils or voids. <br /> Water was encountered at va.ryi.ng depths within the site <br /> boundary ; thus ; depending upon the seasonal conditions and the <br /> elevations of the nearby river, dewatering of the ekcavati.on may <br /> be necessary. <br /> Dee2_Foundations: After those areas to receive foundations <br /> have been brought to an elevation of approximately 55 feet., those <br /> lots ,.: or portions of , identified as suitable for receiving <br /> foundations should be cleared of surface vegetation and debris . <br /> Re Foundadon Eriginecrs, rrc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.