Laserfiche WebLink
1. Tripping, Slipping, and Falling Hazards <br /> CalRecycle personnel will be reminded daily to maintain sure foot ng on all surfaces. In <br /> order to minimize tripping hazards caused by debris, job supplies, and equipment, <br /> material will be removed daily from the work areas and stockpiled in their respective <br /> storage areas. This "housekeeping" effort will be enforced by the 3SHO throughout the <br /> day. <br /> 2. Head and Back Injuries <br /> As a minimum requirement, hard hats will be -worn while performing any site activities. <br /> This will prevent minor injuries that may be caused by overhead obstructions. Personnel <br /> are to use proper lifting techniques whenever they lift heavy objects and seek <br /> assistance if the object is too heavy to lift safety. <br /> 3. Heavy Eauir)ment and Traffic <br /> The use of heavy equipment for drilling, debris removal, excavatio n, or lifting presents a <br /> potential safety hazard for personnel. ALL SITE PERSONNEL WILL WEAR VISABLE <br /> PROTECTIVE CLOTHING. Only qualified personnel will operate heavy equipment. All <br /> other on-site personnel shall remain a safe distance from heavy equipment. <br /> Personnel needing to approach heavy equipment while operating will observe the <br /> following protocols: <br /> a. Make eye contact with the operator(and spotter), <br /> b. Signal the operator to cease heavy equipment activity, <br /> c. Approach the equipment and inform the operator of i itentions. <br /> All equipment must be in good working condition when in use at fie Site. Equipment <br /> that does not appear to be in good repair or appears to be unsafe will not be put into <br /> service until all necessary repairs are made. <br /> 4. Rail-Road Traffic <br /> Due to the proximity of the railroad tracks to the proposed site investigation, staff shall <br /> work around the Union Pacific train schedule. Upon obtaining thE! permit for the"right of <br /> entry"from Union Pacific, clean-up staff shall discuss at the tailgate meeting when the <br /> work will commence and cease. <br /> B. Trenching and Gas Probe Installation <br /> Hazards associated with trenching and probe installations are care-ins; striking of <br /> underground utilities; failing tools, materials, and equipment; and hazardous air <br /> contaminants. <br /> Lodi City Landfill 18 January 2012 <br /> Site Safety and Health Plan <br />