Laserfiche WebLink
I V. Surface Condiloo— <br /> A. Is site access adequately restricted? <br /> B. Is the waste adequately covered to prevent human contact? <br /> ON) <br /> C Is the final drainage system for the site adequate to prevent erosion? <br /> (Yo <br /> D. Is the final grading adequate to promote run-off? (Yo <br /> E. Are slopes greater than 3:1 (33% or 18 degrees)? ON) <br /> F. Are slopes greater than 1.75:1 (57% or 30 degrees)?ON) <br /> V. Postclosure Land Use <br /> A. Has the land use of the site significantly changed since closure? <br /> ON) CA oSeJ J ow-A,- <br /> If yes, include or reference site improvement plans and answer the following: <br /> 1. Give the date that the improvements were constructed "14 <br /> 2. Have the improvements compromised the integrity of the final <br /> cover? (Y/Npo <br /> 3. Has differential settlement affected the improvements? (Y <br /> B. Is there a proposed change in postclosure land use that may jeopardize <br /> the integrity of previously closed sites or pose a potential threat to public <br /> health and safety or the environment? ((DN) <br /> If yes, briefly describe the proposed project: 'I L-a le pae,,� <br /> C Is there a postclosure land use tracking system? (Yo <br /> If yes, describe tracking system: <br /> VI. Disposal Site Priority (See Prioritization Chart) <br /> All: _X_B 3:_ C 1: <br /> -A 24-A 3:_ Bl:-B2: C 2:-C 3:_ D: <br /> VII. Comments I <br /> sik 1,('5 11,pa.J"_" cdt u S LLA&J-"&-k"� <br /> _ <br /> PREPARED BY- <br /> DATE: <br /> COMPLIANCE BRANCH REVIEW: <br /> CIWMB CLOSURE AND REMEDIATION BRANCH APPROVAL: <br /> Page 4 of 4 <br /> CiWMB closure and Remediation Branch(1/25193) <br />