Laserfiche WebLink
IV. Surface Condit',o <br /> A. Is site access adequately restricted? <br /> B. Is the waste adequately covered to prevent human contact? <br /> N), Afc�- . ��7" ., ,\ <br /> C. Is the final drainage system for the site adequate to prevent erosion? <br /> (Y <br /> D. Is the final grading adequate to promote run-off? (Y/N'),-1 k <br /> E. Are slopes greater than 3:1 (33% or 18 degrees)?( <br /> F. Are slopes greater than 1.75:1 (57% or 30 degrees)?°,(Y% I) <br /> V. Postclosure Land Use <br /> A. Has the land use of the site significantly changed since closure') <br /> (Y/N) <br /> If yes, include o,r reference site improvement plans and answer the following: <br /> 1 Give the date that the improvements were constructed <br /> 2. Have the improvements compromised the integrity of the final <br /> cover? CY/NiNA) A 'w) <br /> 3. Has differeritrii settlement affected the improvements? (Y/N) 642,4 <br /> B. Is there a proposed change in postclosure land use that may jeopardize <br /> the integrity of previously closed sites or pose a potential threat to public <br /> A62 <br /> health and safety or the environment? N <br /> If yes, briefly describe the proposed project:_ AJ} <br /> C <br /> rC Is there a postclosure land use tracking system? (Y/N) <br /> If yes, describe tracking system: <br /> VI. Dispose', Site Priority (See Prioritization Chart) <br /> A 1:---A Z—A 3: B 1:—B 2:—B 3: C 1: C 2:_C 3: D: <br /> VII. Comments <br /> PREPARED BY: <br /> DATE: <br /> COMPLIANCE BRANCH REVIEW: <br /> CIWMB CLOSURE AND REMEDIATION BRANCH APPROVAL: <br /> Page 4 of 4 <br /> ClWMB Closure and Remediation Branch(1/25193) <br />