My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
2441
>
4400 - Solid Waste Program
>
PR0526162
>
COMPLIANCE INFO_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2020 2:37:20 PM
Creation date
7/3/2020 10:39:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1
RECORD_ID
PR0526162
PE
4430
FACILITY_ID
FA0004701
FACILITY_NAME
TEICHERT PRECAST STOCKTON
STREET_NUMBER
2441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16334009
CURRENT_STATUS
02
SITE_LOCATION
2441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
CField
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4430_PR0526162_2441 W CHARTER_FILE 1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-2C-cil <br /> erator or incinerators specified in Section 3(A), of said agree- <br /> ment of the 5th day of October, 1959, shall be postponed as <br /> hereinafter specified, and until such incinerator or incinerators <br /> are constructed, the garbage and refuse which would othertaise be <br /> disposed of by means of. the incinerator or incinerators shall be <br /> disposed of by the Contractor by means of fill and cover operations. <br /> 2. The Contractor shall commence construction of said <br /> incinerator or incinerators within sixty (60) days after it has <br /> developed additional infor.:iation sufficient to enable the con- <br /> tractor to determine the capacity of incinerator or incinerators <br /> required, and the incinerator or incinerators shall be in operation <br /> within one hundred eighty (180) days after such additional in- <br /> formation has been developed, provided, however, that the maximum <br /> amount of time allowed for developing such additional information <br /> shall be one hundred eighty (180) days from the date of this <br /> supplemental agreement. The fill and cover operations shall be dis- <br /> continued when the incinerator or incinerators are placed in <br /> operation as hereinabove specified. A penalty of ONE HUNDRED AND <br /> NO/100 ($100.00) DOLLARS per day shall be paid by Contractor to City <br /> for use of the fill and cover operation after the Three Hundred Sixty <br /> (360) day time limit provided for herein. <br /> 3. The City agrees to pay the Contractor SIX THOUSAND <br /> AND N0/100 ($6,000.00) DOLLARS per month during the term of this <br /> agreement. It is expressly understood that each month's payment <br /> is in consideration of the operation and maintenance of the <br /> garbage and refuse disposal services provided by the Contractor <br /> during the preceding month. Said payments shall entitle City, <br /> its authorized collectors and agents to dispose of Thirty-Five <br /> Hundred (3500) tons of garbage and refuse each month. Any• garbage <br /> and refuse disposal by the City in excess of Thirty-Five Hundred <br /> (3500) tons per month or of Cne Hundred Forty (140) tons during <br /> any given day shall incur a charge of T140 AND N0/100 ($2.00) DOLLARS <br />
The URL can be used to link to this page
Your browser does not support the video tag.