My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1972-1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1972-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 9:39:29 AM
Creation date
7/3/2020 10:39:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1972-1989
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1972-1984.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />Mr. Joe Walker <br />II. Indeterminate Criteria: <br />A. Surface Waters: A determination of compliance with the surface <br />water cri-Eerion will not be made until. a water quality management <br />plan is approved for your area as required under Section 208 of <br />the Clean Water Act, as amended. Upon adoption of such a plan, <br />your site will be revisited and the current indeterminate status <br />resolved. <br />B. Groundwater: Before a determination can be made on this criterion, <br />an evaluation must be made of the adequacy of the existing imnitoring <br />well system for determining groundwater quality. This evaluation <br />will be made by the Board's Engineering Geologist. <br />C. Disease: Conformance with the State Minimum Standard for cover <br />is necessary for compliance with this criterion. One site visit <br />was not sufficient to determine if daily cover is being applied <br />as required. Additional site visits aryl/or aerial observations <br />will be made to determine if daily cover is being applied as required. <br />D. Safety/Bird Hazard to Aircraft: Because the site lies within 10,000 <br />. feet of-an-'a-irport runway used for jet aircraft and the airport <br />has been identified by the EPA as having solid waste related bird <br />problems, a comprehensive evaluation is needed to determine if <br />birds attracted to the site cause a hazard to aircraft. <br />The SWMB is providing a grace period of three months beginning with the <br />date of this letter for you to correct the RCRA non-compliance determina- <br />tions(s) noted above. If you take advantage of this opportunity to upgrade <br />your site you must notify the SWMB in writing of the corrective actions <br />taken before the end of the grace period and request a re-evaluation. <br />Upon this notification, Board staff will schedule a re-evaluation of <br />your site for all RCRA criteria except those classified as needing further <br />investigation. <br />Sites not requesting a re-evaluation before the Expiration of the grace <br />period, and sites failing to met the criteria at the requested <br />re-evaluation, are subject to inclusion on the Open Dump Inventory list <br />that will be sent to the Environmental Protection Agency and published <br />in the Federal Register. <br />Further investigation is required in order to make a determination for <br />the four indeterminate criterion(ia). When the evaluation of the indeterminate <br />criterion(ia) is completed you will be notified of the result in writing <br />and if non-compliance with RCRA is noted a three month grace period will <br />start at that time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.