My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-1996
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1989-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 9:40:02 AM
Creation date
7/3/2020 10:39:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-1996
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1989-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 1 , 1992 <br /> Ed Padilla `... <br /> Senior Environmental Health Specialist <br /> San Joaquin Local Health Disrict <br /> 445 N. San Joaquin Street <br /> Stockton, CA 95201 <br /> RE: Winterization Plan for Austin Road Sanitary Landfill <br /> Mr. Ed Padilla: <br /> The following Winterization Plan is submitted for review. <br /> I. LOCATION AND DESCRIPTION OF WINTER DISPOSAL SITE <br /> The location of the disposal area will be between stations 33+00 and 36+00 as <br /> shown on the topographic base map. The amount of waste to be received is based <br /> on a projected scale volume of waste of 44,000 tons for the 1992-93 seasonal <br /> duration of 4 months. The waste fill volumes have been compiled by using <br /> 15 foot lift above existing grades with side slopes of 3:1 and a 3% grade slope. <br /> If sufficient space is not available for the duration period, we have an alternate <br /> winter pad located at station 21+00 and 23+00 and we can use the same access <br /> road. <br /> A <br /> 11. WINTERIZATION PAD AND ACCESS ROAD p <br /> The pad is made up of a concrete and asphalt chip base approximately 4 feet thick <br /> with a 6" asphalt top layer. The dimensions of the pad are 200X100 feet and it . <br /> provides sufficient maneuverability for vehicle travel and unloading operations. <br /> The access road is asphalt and 20 feet wide. It provides vehicles access to and <br /> from the winter pad. <br /> 4 <br /> I I I.DRA INAGE f <br /> We have an intermediate grading plan which was submitted and approved on <br /> 9/21 /90 by the State Water Quality Control Board. With the 3% grade slope and <br /> the 3:1 side slopes, the storm water will drain off the top of the landfill to the <br /> i-.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.