My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-1996
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1989-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 9:40:02 AM
Creation date
7/3/2020 10:39:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-1996
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1989-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 1' 1992 <br /> Ed Padilla � , '�� "4`% <br /> Senior Environmental Health Specialist <br /> San Joaquin County Local Health District <br /> 445 N. San Joaquin Street <br /> Stockton, CA 95201 <br /> RE: WINTERIZATION PLAN FOR FRENCH CAMP SANITARY LANDFILL <br /> Mr. Ed Pad i Ila <br /> The following Winterization Plan is submitted for review. <br /> I. LOCATION AND DESCRIPTION OF WiNTER DISPOSAL SiTE <br /> The location of the disposal area will be adjacent to the existing dumping <br /> area at the south/west corner of the landfill. The area to receive waste <br /> during this time is shown on the attached map. The amount of waste to be <br /> received during the winter period is based on a projected scale <br /> 8,500 tons for the 1992-93 winter season, volume of <br /> if. WINTERIZATION PAD AND ACCESS ROAD <br /> All winter roads are in place. All roads and pad to be used with the excep- <br /> tion of roads adjacent to the working face, are asphalt with a compacted <br /> aggregate base material. These roads provide vehicles access to and from <br /> the winter pad. <br /> Ill. DRAINAGE <br /> Storm water will be directed override to the toe of the landfill. Areas where <br /> ponding may occur, such as depressions due to settlement, will be filled with <br /> cover soil to insure adequate drainage from the working fill area. <br /> iV. SORROW STOCKPILE I <br /> P ` <br /> The stockpile of cover material is located adjacent to the proposed Winter <br /> Dump area and is adequate for site needs. To supplement thisi <br /> we also re- <br />
The URL can be used to link to this page
Your browser does not support the video tag.