Laserfiche WebLink
The extraction and treatment facility is completed except for minor <br />repairs and adjustments. To date, our record shows over 23,000,000 <br />gallons of groundwater being treated. Our consulting engineer, <br />EMCON Associates, has been notified of potential scaling problems <br />which can possibly reduce the affectiveness of the system. <br />The quarterly monitoring report, CRWQCB Order No. 92-143 - Waste <br />Discharge Requirements (NPDES No. CA0082911) prepared by RESNA <br />Industries, Inc. were mailed to your office in December 1994. <br />lei -•CO) z 0 40 110)• 0 FY <br />The recent groundwater monitoring laboratory test results indicate <br />the groundwater contamination is still confined within the area <br />reported in the Corrective Action Plan. <br />The groundwater gradient and velocity results for 1994 calculates <br />the flow in the northeasterly direction at a velocity rate of 1.45 <br />ft. per year to 141.33 ft. per year. <br />r r= . •, • r <br />Residential waste ....... 50,280.63 Tons <br />Commercial/Industrial ... 73,829.95 Tons <br />H1J§4-J&Z*RM <br />1.11 mil c.y. / 5.6 mil c.y. = 19.8% <br />