Laserfiche WebLink
a <br /> AUSTIN ROAD LANDFILL EXPANSION �!— <br /> REPORT OF DISPOSAL SITE INFORMATION (RDSI) MATRIX <br /> I <br /> G. SITE LIFE <br /> PROJECTION <br /> H. END USE OF SITE <br /> II.REGULATORY <br /> REQUIREMENTS <br /> PERMITS AND <br /> APPROVALS <br /> III. DISPOSAL SITE <br /> DESIGN <br /> A. DESIGN PLANS cod <br /> ulol <br /> 1.'title Sheet 14 CCR 18222(d) Title sheet includes vicinity and location maps, drawing CEP DWG. G-1 c�a� <br /> list E$` <br /> 2. Site Plan 14 CCR 18222(e) Final Grading Plan(P-1) shows: CEP DWG. P-1 f)cf' <br /> • Expansion property boundary <br /> 14 CCR 18222(1) , Limits of expanded landfill <br /> 14 CCR 18222(g) • Setback areas and areas not used for landfilling <br /> • Locations of ancillary facilities <br /> Excavation and Site Preparation Plan(P-2) shows: CEP DWG. P-1 <br /> • Existing topography <br /> 3. Construction <br /> Sequencing Plans <br /> a. Excavation/ 14 CCR 17680 The following drawings show the construction sequence CEP DWG. P-2 <br /> Stockpiling Plans of the landfill: <br /> • P-2: Excavation and Site Preparation Plan: CEP DWG. P-3 <br /> • Borrow area(daily/intermediate,final cover) <br /> • Soil stockpiling area(most cell excavation CEP DWG. P-4 <br /> will be used directly as daily cover and not <br /> stockpiled) FDSR Section <br /> • Base grades superimposed on pre-disposal 1.1 <br /> topography <br /> • P-3: Phase Development Plan, Horizontal <br /> Expansion <br /> • P-4: Phase Development Plan,Vertical Expansion <br /> FDSR Section 1.1 - Landfill Plans describes the phased <br /> development of the landfill. <br /> b. Base Preparation/ Drawings.P-3 and P-4 show liner contours for each CEP DWG. P-3 <br /> Liner Placement Plans individual phase <br /> CEP DWG. P-4 <br /> c. Fill Sequencing 14 CCR 18222(g) Drawings P-3 and P-4 show: CEP DWG. P-3 <br /> Plans • Final contours for each stage of phase <br /> development CEP DWG. P-4 <br /> • Table on P-4 shows table estimated year of phase <br /> construction and closure, FDSR Table 1-1 shows FDSR Table 1-1 . <br /> volume of each phase. <br /> d. Final Grading Plan 14 CCR 18222(h) Drawing P-1 -Final Grading Plan shows final elevations CEP DWG. P-4 <br /> of the completed dis oral site. <br /> 4. Leachate Collection 14 CCR 18222(k) Drawings P-3 and P-4 show leachate collection piping, CEP DWG. P-3 <br /> and Removal System lechate collection swales, and collection sumps. CEP DWG. P-4 <br /> Leachate collection system details are shown on Drawing CEP DWG. P-7 <br /> P-7. <br /> 5. Surface Drainage 14 CCR 182220) Final surface water drainage plan is shown on Drawing CEP DWG. P-1 <br /> Plans P-1, Drawings P-7, P-8, and P-9 show surface water CEP DWG. P-7 <br /> drainage details. CEP DWG. P-8 <br /> CEP DWG. P-9 <br /> 6. Site Access Plan 14 CCR 17680 <br /> C:\AAPF\AUSTION\RDSIMTRX.DOC 5/14/95 2:31 PM PAGE 2 <br />