City of Stockton TL 394-0027-02 <br /> March 10, 1994 Page 8 <br /> A-2 Decontamination: Decontamination procedures will be <br /> implemented to reduce the potential for cross-contamination between <br /> soil borings . <br /> Before, during, and following drilling operations, the augers and <br /> associated drilling and sampling equipment will be thoroughly <br /> cleaned using a high pressure hot water (steam) washer. The hot <br /> water washer has a pressure of approximately 1,200 pounds per <br /> square inch and a water temperature of approximately 100 degrees <br /> Centigrade ( OC) . The sampler and brass sleeves will be washed in <br /> a Alconox* detergent solution, rinsed with clean tap water, and <br /> air-dried prior to initial use and between each sampling event. <br /> The augers will be steam cleaned prior to the drilling of each soil <br /> boring. <br /> Prior to construction of monitoring wells, all casings will be <br /> cleaned in the same manner as the drilling equipment. <br /> A-3 Soil Gas Probe Installation: Twining is a C-57 licensed water <br /> well drilling contractor (Contractor's License No. 506159) . The <br /> soil gas probes will be installed under the direction of a <br /> California-registered geologist or -certified professional <br /> engineer. <br /> Soil borings for gas probes will be drilled and sampled according <br /> to Twining's "Standard Operating Procedures for Drilling and Soil <br /> Sampling" . Equipment used for drilling, sampling, and constructing <br /> wells, and well construction materials will be thoroughly cleaned <br /> according to Twining's "Standard Operating Procedures for Equipment <br /> Decontamination" . <br /> Soil gas probes will be constructed of Schedule 80 polyvinyl <br /> chloride (PVC) casing. Screen will be machine-slotted. Teflon TM <br /> tubing will extend from approximately one foot below the bottom <br /> stopper to approximately one foot above the top stopper for sample <br /> collection. Casing and well screen specifications may depend upon <br /> project objectives, site conditions, and project budgets. The well <br /> screen and casing sections will be joined by factory-made flush- <br /> threaded connections. <br /> The well filter pack material will consist of appropriately-sized <br /> pre-washed sand or pea gravel . The filter material will be placed <br /> in the annulus between the boring wall, from the bottom of the <br /> boring to approximately 2 feet above the top of the screen. <br /> Approximately one foot of bentonite will be placed on top of the <br /> sand pack. The bentonite may consist of 1/4- or 1/2-inch pellets, <br /> or may be in the form of a slurry. If pellets are used, they will <br /> be hydrated prior to grouting the well, by adding at least one <br /> gallon of water for every bucket of pellets. The thickness of the <br />