My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-1994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1993-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2021 9:25:03 AM
Creation date
7/3/2020 10:39:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-1994
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1993.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK PLAN FOR GROUNDWATER MONITORING <br /> WELL INSTALLATION <br /> AUSTIN ROAD LANDFILL <br /> SAN JOAQUIN COUNTY, CALIFORNIA <br /> 1 .0 INTRODUCTION <br /> This work plan is for the installation of two groundwater <br /> monitoring wells at the Austin Road Landfill, San Joaquin County, <br /> California. Preparation of this work plan was authorized by the <br /> City of Stockton by purchase order number 058883, dated February 9, <br /> 1994 . <br /> This work plan was prepared by the Environmental Services Division <br /> of The Twining Laboratories, Inc. (Twining) in Modesto, California. <br /> 2 .0 PURPOSE AND SCOPE <br /> The purpose of this project is to install two groundwater <br /> monitoring wells to a depth of 125 feet below site grade (BSG) . <br /> The new wells are intended to replace shallower wells used for <br /> quarterly monitoring purposes that are currently dry. The <br /> following scope of work is proposed to achieve the above referenced <br /> objective: <br /> o Drill two soil borings to 125 feet below site grade (BSG) and <br /> collect soil samples for lithology purposes; <br /> o Complete borings as two-inch diameter groundwater monitoring <br /> wells; <br /> o Develop wells and install dedicated bladder pumps; and <br /> o Prepare a report documenting field activities for each <br /> landfill. A site location map, a site plan showing well <br /> locations, final boring logs, well construction diagrams, and <br /> well development logs will be included. <br /> 3.0 BACKGROUND <br /> A description of the site, the geologic and hydrologic <br /> characteristics, and the project history are summarized in the <br /> following subsections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.