Laserfiche WebLink
M M M M M M W M M <br /> TABLE S.1: SUMMARY OF IMPACTS AND MITIGATION MEASURES (Continued) <br /> Environmental Impact Mitigation Measure Level of Significance After Mitigation <br /> G. Air Quality(Cont.) <br /> (b) Design and implement a landfill gas recovery <br /> system to ensure efficient destruction of <br /> odoriferous substances,and to ensure that there <br /> are no major odor leaks to the atmosphere. <br /> (c) Ensure that loading,unloading,and material <br /> handling activities are carried out efficiently and <br /> without delays to avoid excessive odors. <br /> (d) Apply daily cover over odorous materials as soon <br /> as possible. <br /> G.6. The project,by extending the time the current None warranted. <br /> number of vehicles trips travel to and from the <br /> site,would result in an increase in criteria air <br /> pollutant emissions. (ADVERSE) <br /> G.7. The project,by incrementally adding to See Mitigation Measures G.1.and G.5. Less than Significant <br /> regional air pollutant emissions, would have a <br /> cumulative air quality impact. <br /> (SIGNIFICANT) <br /> S.21 <br />