Laserfiche WebLink
6. Physical Factors: <br /> a. Soil suitability (for projects involving construction) <br /> Project will adhere to all governmental regulations. <br /> b. Degree of flood protection <br /> 100-year. <br /> C. Public or man-made waterways existing on or abutting site <br /> North Branch South Fork Little Johns Creek. <br /> 7. Biological Factors: <br /> a. Locations, p size species and number of trees to be removed. List rare or <br /> endangered flora or fauna and significant wildlife habitat found on or near <br /> the site. <br /> (See Appendix "A" for response.) <br /> CERTIFICATION: . I hereby certify that the statements furnished above and in the attached <br /> exhibits present the data and information required for this initial evaluation to the best <br /> of my ability, and that the facts, statements, and information presented are true and <br /> correct to the best of my knowledge and belief. <br /> Date JV,7 -�-�-t— <br /> (Signature)* <br /> Date <br /> (Signature) <br /> (FOR STAFF USE ONLY) <br /> C. Environmental Impacts: <br /> 1. Will the project create adverse impacts on the following public facilities and <br /> utilities? If yes is checked, further explanation is necessary. <br /> L�4 <br /> a. Solid Waste R <br /> b. Water Supply % <br /> C. Liquid Waste R <br /> d. Storm Water R <br /> e. Gas & Electric % <br /> f. Other Urban Services ' R <br /> —3— j <br />