Laserfiche WebLink
PE OF FACILITY <br /> WASTE-TO- <br /> MITIGATION SURESGY TRANSFER COMPOSTING <br /> LANDFILL FACILITY STATION FACILITY <br /> Degradation of Air <br /> a. Install Proper Air <br /> Emission Control <br /> Equipment X <br /> b. Flare Gas Emissions X <br /> c. Install Gas Collection <br /> Systems X <br /> Gas Emissions <br /> a. Use Impermeable Covers and <br /> Liners X <br /> b. Install Gas Collection <br /> and Control Systems X <br /> c. Install Gas <br /> Extraction System X <br /> d. Flare Gases X <br /> Dust <br /> a. Wet Down Site and <br /> Vehicle Loads X X <br /> b. Install Fans X X <br /> c. Limit Hours of <br /> Operations X X X <br /> d. Enclose Grinding <br /> Operations X X <br /> Visual <br /> a. Contour or Sculp <br /> Landfill Face X <br /> b. Use Natural Harriers X X X X <br /> c. Landscape and <br /> Revegetate X X X X <br /> d. Construct Berms X X X X <br /> Traffic <br /> a. Improve Access and <br /> Egress Roads X X X X <br /> b. Restrict Sours of <br /> Operation X X X X <br /> c. Install Signal Lights <br /> and Directional <br /> Signs X X X X <br /> d. Institute Split <br /> Operations X <br /> e. Increase Size of <br /> Receiving Area X X X X <br /> 14 <br />