Laserfiche WebLink
MONITORING AND REPORTING PROGRAM NO.R5-2002-0121 -2- <br /> FOR FORWARD INC. <br /> AUSTIN ROAD LANDFILL FACILITY <br /> CLASS III LANDFILL <br /> SAN JOAQUIN COUNTY <br /> frequently than required at the locations specified herein shall be reported to the Board. An <br /> annual report shall be submitted to the Board which contains both tabular and graphical <br /> summaries of the monitoring data obtained during the previous twelve months, so as to show <br /> historical trends at each well. The report shall include a discussion of the progress toward re- <br /> establishment of compliance with waste discharge requirements and water quality protection <br /> standards. <br /> Method detection limits and practical quantitation limits shall be reported. All peaks shall be <br /> reported, including those which cannot be quantified and/or specifically identified. Metals shall <br /> be analyzed according to the method listed in Attachment D. <br /> .B. REQUIRED MONITORING REPORTS <br /> 1. Water Quality Protection Standard Report <br /> The Discharger submitted a water quality protection standard in the "Article 5 Monitoring <br /> Program" dated July 1992. Any changes to the water quality protection standard shall be <br /> described in the annual monitoring report. <br /> 2. Corrective Action Monitoring Report <br /> The Discharger shall submit reports of the results of corrective action monitoring in <br /> accordance with the schedules specified in this Monitoring and Reporting Program. The <br /> Discharger shall report, in writing, to the regional board on the effectiveness of the corrective <br /> action program. In determining the effectiveness of the corrective action program the <br /> Discharger shall use the evaluation procedures proposed in `Evaluation Procedures for <br /> Proposed Corrective Action at Austin Road Landfill" (Herst& Associates, 2002). The <br /> Discharger shall submit these reports at least semi-annually. <br /> 3. Annual Monitoring Summary Report <br /> The Discharger shall submit the Annual Monitoring Summary Report as specified in the <br /> Standard Provisions and Reporting Requirements. Additionally, in the annual report the <br /> Discharger shall compare the progress toward cleanup over the previous year with the results <br /> of the groundwater model. The groundwater model shall be updated periodically as needed. <br />