Laserfiche WebLink
1 <br /> WASTE DISCHARGE REQUIREMENTS ORDER NO. <br /> FOR ALLIED WASTE INC.&FORWARD INC. <br /> AUSTIN ROAD LANDFILL <br /> CLASS III LANDFILL <br /> SAN JOAQUIN COUNTY <br /> 10. The Discharger shall complete the tasks outlined in these WDRs and the attached <br /> Monitoring and Reporting Program No. in accordance with the following <br /> time schedule: <br /> Task Compliance Date <br /> a. Install improvements to the 31 October 2002 <br /> landfill gas collection system that <br /> will prevent future release of <br /> VOCs from the facility. <br /> b. Complete construction of 15 October 2002 <br /> enhanced groundwater recharge <br /> facilities. <br /> c. Install interim final cover over the 15 November 2002 <br /> entire unlined footprint of the <br /> landfill. <br /> E. REPORTING REQUIREMENTS <br /> 1. The Discharger shall comply with the reporting requirements specified in this Order, <br /> in Monitoring and Reporting Program Order No. and in the Standard <br /> Provisions and Reporting Requirements. <br /> 2. The Discharger shall submit a closure and post-closure maintenance plan(or submit <br /> suitable modifications to a pre-existing plan), that complies with 40 CFR 258.60 and <br /> 258.61, and with Title 27. <br /> 3. The Discharger shall notify the Board in writing of any proposed change in ownership <br /> or responsibility for construction or operation of the WMUs. The Discharger shall <br /> also notify the Board of a material change in the character, location or volume of the <br /> waste discharge and of any proposed expansions or closure plans. This notification <br /> shall be given 90 days prior to the effective date of the change and shall be <br /> accompanied by an amended Report of Waste Discharge and any technical documents <br /> that are needed to demonstrate continued compliance with these WDRs. <br />