Laserfiche WebLink
TABLE OF CONTENTS <br /> INTRODUCTION <br /> SECTION 1 EVALUATION OF GREEN MATERIALS AS DAILY COVER <br /> 1.0 SELECTION OF ALTERNATIVE COVER <br /> 1.1 FUNCTIONAL PRIORITIES RANKING <br /> 1.2 COMPARISON OF ALTERNATIVE COVER TO SOIL COVER <br /> 1.3 EXPECTED PERFORMANCE <br /> 1.4 EVALUATION OF PAST PERFORMANCE <br /> 1.5 DUST, ODOR, LEACHATE GENERATION <br /> 1.6 AREAS OF CONCERN <br /> SECTION 2 PROCESS DESCRIPTION <br /> 2.0 FRENCH CAMP LANDFILL SITE PLAN <br /> 2.1 PROCESS DESCRIPTION <br /> 2.2 OPERATING PLAN <br /> 2.3 FRENCH CAMP LANDFILL ALTERNATIVE COVER PLAN <br /> 2.4 AUSTIN ROAD LANDFILL ALTERNATIVE COVER PLAN <br /> SECTION 3 APPROVAL CONDITIONS <br /> 3.0 CEQA REQUIREMENTS <br /> 3.1 TERMINATION <br /> 3.2 LEA MONITORING <br /> 3.3 PROJECT SCHEDULE <br /> 3.4 REGIONAL WATER QUALITY CONTROL BOARD CLEARANCE <br /> 3.5 FIRE DEPARTMENT APPROVAL <br /> LIST OF TABLES,FIGURES,AND APPENDIX <br /> TABLE I COMPARISON OF ALTERNATIVE COVER TO SOIL <br /> FIGURE I GREEN MATERIALS PROCESSING SITE PLAN <br /> FIGURE 2 GREEN WASTE PROCESSING SCHEMATIC DIAGRAM <br /> FIGURE 3 4 X 4 PLAN <br /> FIGURE 4 TYPICAL CELL <br /> FIRE DEPARTMENT APPROVAL LETTER <br /> NOTICE OF EXEMPTION <br /> LOCATION MAP <br /> AUSTIN ROAD LANDFILL MAP <br /> FRENCH CAMP LANDFILL MAP <br />