My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-1996
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1995-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2021 9:30:54 AM
Creation date
7/3/2020 10:40:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-1996
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1995-1996.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> green waste sloughing and/or washing down the operating face of the landfill. Therefore, <br /> Gambi is required to have an attendant on duty (from 6:00 am or sunrise until 4:30 pm) on <br /> days when the landfill is closed and the working face has been covered with green waste. <br /> The attendant on duty will be a landfill equipment operator who is trained in operating all of <br /> the equipment at the Austin Road Landfill. The equipment operator shall be directed (in case <br /> of green waste sloughing and/or washing down the operating face of the landfill) to use <br /> necessary equipment to place ADC over the working face of the landfill. In the event that the <br /> green waste is too wet to place over the working face of the Landfill. then the attendant shall <br /> cover the working face with Covertech 400 Tarps, visqueen, etc. <br /> V. DRAINAGE: <br /> The storm water runoff will collect at the south toe of the soil stockpiled for use as cover <br /> material. Three 4 inch diameter pipes have been installed under the stockpile of cover material <br /> (Figure 2). If water ponds in this area. portable pumps will be placed in the low area and the <br /> runoff pumped through the pipes to the drainage ditch located between the dirt stockpile and the <br /> access road. <br /> The storm water from the remainder of the Landfill will be handled in accordance with the <br /> intermediate grading plan which was submitted and approved on September 21, 1990, by the <br /> State Water Quality Control Board. <br /> VI. BORROW STOCKPILE: <br /> Approximately 5.000 cubic yards of soil has been stockpiled at the Landfill for use as soil <br /> cover on Fridav of each week (Figure ,, page 3). It is estimated that the 5,000 cubic yards of <br /> soil will provide six weeks of cover. During the rainy season (November through April) the <br /> stockpile of dirt will be covered with visqueen to help keep the soil dry and useable as cover <br /> material. <br /> If more cover material is needed, it will be replenished during periods of dry weather. <br /> VII. SUMMARY: <br /> This Winterization Plan is designed to provide continual and uninterrupted service for the <br /> winter of 1995-96: with use of green waste as ADC, proper drainage. provision of adequate <br /> refuse space. and compliance with applicable rules and regulations. <br /> If you have any questions, please call me at 465-3404. <br /> �HWIfLGIA BA TIANI. PRESIDENT <br /> GAMBI ENTERPRISES. INC. <br /> PG:hwm <br /> cc: James Giottonini. Public Works Director. City of Stockton <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.