Laserfiche WebLink
i <br /> AUSTIN ROAD LANDFILL EXPANSION <br /> SUMMARY OF REQURIED PERMITS-JULY, 1995 <br /> Responsible Agency Permit/Approval Status Conditions <br /> FEDERAL <br /> COE Dredge-and-Fill (Section Application to be Conditions to be <br /> 404 Permit submitted in August, submitted in addendum <br /> 1995. Process can take to RDSI prior to issuance <br /> 3-9 months once a of Solid Waste Facility <br /> complete application is Permit. <br /> filed. <br /> FAA Notice of Proposed Notice submitted on No conditions were <br /> Construction or May 4, 1994. required. <br /> Alteration <br /> USFW Authorization for Take No permit required. Conditions to be <br /> (Section 10(a)) Consultation to COE included in COE Section <br /> process. 404 Permit, and will be <br /> submitted in addendum <br /> to RDSI prior to issuance <br /> of Solid Waste Facitliy <br /> Permit. <br /> STATE <br /> CIWMB Oversight on Solid Agency has six months This is the final <br /> Waste Facility Permit to review, have public permitting step; <br /> hearings, and make conditions will be <br /> comments to the LEA assigned in process. <br /> once a complete <br /> application is filed. <br /> DFG Streambed Alteration Permit is essentially a Conditions to be <br /> Permit construction-type submitted in addendum <br /> permit, which can be to permit. <br /> issued within 30 days <br /> after the Conditional <br /> Use Permit is aeproved. <br /> Reclamation Board Encroachment Permit Application submitted Conditions to be <br /> and currently on submitted in addendum <br /> inactive status while to RDSI prior to issuance <br /> creek orientation is of Solid Waste Facility <br /> finalized. Process can Permit. <br /> take 3-6 months once a <br /> complete application is <br /> filed. <br /> R. W.BECK AND ASSOCIATES l-1 <br /> 01/1811-01.219 <br />