My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1996_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
ARCHIVED REPORTS_1996_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:10 PM
Creation date
7/3/2020 10:40:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1996_1
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1996_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> AUSTIN ROAD LANDFILL EXPANSION <br /> SUMMARY OF REQURIED PERMITS-JULY, 1995 <br /> Responsible Agency Permit/Approval Status Conditions <br /> FEDERAL <br /> COE Dredge-and-Fill (Section Application to be Conditions to be <br /> 404 Permit submitted in August, submitted in addendum <br /> 1995. Process can take to RDSI prior to issuance <br /> 3-9 months once a of Solid Waste Facility <br /> complete application is Permit. <br /> filed. <br /> FAA Notice of Proposed Notice submitted on No conditions were <br /> Construction or May 4, 1994. required. <br /> Alteration <br /> USFW Authorization for Take No permit required. Conditions to be <br /> (Section 10(a)) Consultation to COE included in COE Section <br /> process. 404 Permit, and will be <br /> submitted in addendum <br /> to RDSI prior to issuance <br /> of Solid Waste Facitliy <br /> Permit. <br /> STATE <br /> CIWMB Oversight on Solid Agency has six months This is the final <br /> Waste Facility Permit to review, have public permitting step; <br /> hearings, and make conditions will be <br /> comments to the LEA assigned in process. <br /> once a complete <br /> application is filed. <br /> DFG Streambed Alteration Permit is essentially a Conditions to be <br /> Permit construction-type submitted in addendum <br /> permit, which can be to permit. <br /> issued within 30 days <br /> after the Conditional <br /> Use Permit is aeproved. <br /> Reclamation Board Encroachment Permit Application submitted Conditions to be <br /> and currently on submitted in addendum <br /> inactive status while to RDSI prior to issuance <br /> creek orientation is of Solid Waste Facility <br /> finalized. Process can Permit. <br /> take 3-6 months once a <br /> complete application is <br /> filed. <br /> R. W.BECK AND ASSOCIATES l-1 <br /> 01/1811-01.219 <br />