My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1996_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
ARCHIVED REPORTS_1996_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:10 PM
Creation date
7/3/2020 10:40:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1996_1
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1996_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. Introduction <br /> CEQA also requires that a Lead Agency establish a Mitigation g and Reporting <br /> han <br /> ( <br /> program( )at the time of project approval to ensure the implementation of"cprogramges to <br /> the project"that are "adopted or made a condition of project approval in order to mitigate or <br /> avoid significant effects on the environment." Accordingly,an will need to be prep <br /> ared <br /> for the project. This NZIRP will be considered by the City of Stockton Department of <br /> Community Development Planning Division in conjunction with project review and will be <br /> included as a condition of project approval. <br /> ER ORGANIZATION <br /> This Draft EIR is the first part of a two-volume set that will comprise the Final EIR for the <br /> project. Volume I contains the Draft EIR and Technical Appendices;Volume 2 will include the <br /> comments received during the public review period and responses to those comments. Technical <br /> reports and other documents incorporated by reference into the EIR will be available for public <br /> review at the City of Stockton Department of Community Development Planning Division in the <br /> City of Stockton. <br /> This Draft EIR is organized into the following sections: <br /> &MM= <br /> The Summary chapter summarizes the project description,the environmental impacts that would <br /> result from project implementation,mitigation measures suggested to reduce or eliminate <br /> impacts,and alternatives to the project. <br /> Mier I.Introduction <br /> Chapter I provides an introduction and overview that describes the project and discusses the need <br /> for the project. It also discusses the intended use of the EIR,summarizes the EIR review and <br /> certification process,and sets forth some of the assumptions critical to the environmental <br /> analysis. <br /> Shapt�_r II Proiect Description <br /> Chapter H discusses the project sponsor's objectives,the project location,project characteristics, <br /> project schedule,and other agencies that will use this EIR. <br /> l <br /> I.7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.