My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1996_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
ARCHIVED REPORTS_1996_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:10 PM
Creation date
7/3/2020 10:40:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1996_1
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1996_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RDS' MATRIX <br /> RDSI SECTION REG.CITATION RESPONSE REFERENCE <br /> • Bob Evans Trucking (209,1239-3407 <br /> • Price Heavy Equipment (209)465-3405 <br /> • Don Lawly Heavy Equipment (209)466-8088 <br /> • American ui ment 209 941-9856 <br /> V.C.3. Equipment Preventative 14 CCR 17695 Operator keeps a maintenance log on equipment. <br /> Maintenance Equipment is maintained (oil,coolant,airfilters,etc.) <br /> based on manufactures recommended schedule. <br /> V.D. MATERIALS HANDLING ACTIVITIES <br /> V.D.1.Construction Sequencing Detailed construction sequencing plans for each phase of Appendix B,CEP <br /> the landfill expansion is considered beyond the scope of Dwg. P2,CEP Dwg. <br /> the conceptual expansion design.Generally for Phases I P3 <br /> through IV,the horizontal expansion phases,the phases <br /> will be excavated during the landfill operation to provide <br /> daily and intermediate cover material (See CEP Dwg. P3. <br /> An excess material stockpile are is shown over the <br /> existing landfill(LF 1)area on CEP Dwg. P2.The vertical <br /> expansion,Phases V and VI,will not require stockpiling <br /> of material for development. <br /> The liner grading,waste filling,and final grading <br /> sequence by expansion phase is shown on CEP drawings <br /> P3 and P4.. <br /> V.D.2. Unloading 14 CCR 17676 Unloading operation procedures will be similar to Appendix H,DEIR <br /> existing procedures."L"shaped dumping arrangement Pages II.24 to II.27 <br /> will be used to minimize blown litter. <br /> V.D.3. Spreading and 14 CCR 17677 Unloading operation procedures will be similar to Appendix H,DEIR <br /> Compacting 14 CCR 17678 existing procedures.Dedicated landfill compactors (CAT Pages II.24 to II.27 <br /> 826 C)are currently used to spread and compact waste <br /> and will be continued to be used in the landfill <br /> expansion.Maximum depth of uncompacted waste will <br /> be amoximatelz 2 feet.O eration slo es on ro osed <br /> 0:VNGHA"LI059.D0C M"6 R. W Beck 2-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.