Laserfiche WebLink
RDS' MATRIX <br /> RDSI SECTION REG.CITATION RESPONSE REFERENCE <br /> • Bob Evans Trucking (209,1239-3407 <br /> • Price Heavy Equipment (209)465-3405 <br /> • Don Lawly Heavy Equipment (209)466-8088 <br /> • American ui ment 209 941-9856 <br /> V.C.3. Equipment Preventative 14 CCR 17695 Operator keeps a maintenance log on equipment. <br /> Maintenance Equipment is maintained (oil,coolant,airfilters,etc.) <br /> based on manufactures recommended schedule. <br /> V.D. MATERIALS HANDLING ACTIVITIES <br /> V.D.1.Construction Sequencing Detailed construction sequencing plans for each phase of Appendix B,CEP <br /> the landfill expansion is considered beyond the scope of Dwg. P2,CEP Dwg. <br /> the conceptual expansion design.Generally for Phases I P3 <br /> through IV,the horizontal expansion phases,the phases <br /> will be excavated during the landfill operation to provide <br /> daily and intermediate cover material (See CEP Dwg. P3. <br /> An excess material stockpile are is shown over the <br /> existing landfill(LF 1)area on CEP Dwg. P2.The vertical <br /> expansion,Phases V and VI,will not require stockpiling <br /> of material for development. <br /> The liner grading,waste filling,and final grading <br /> sequence by expansion phase is shown on CEP drawings <br /> P3 and P4.. <br /> V.D.2. Unloading 14 CCR 17676 Unloading operation procedures will be similar to Appendix H,DEIR <br /> existing procedures."L"shaped dumping arrangement Pages II.24 to II.27 <br /> will be used to minimize blown litter. <br /> V.D.3. Spreading and 14 CCR 17677 Unloading operation procedures will be similar to Appendix H,DEIR <br /> Compacting 14 CCR 17678 existing procedures.Dedicated landfill compactors (CAT Pages II.24 to II.27 <br /> 826 C)are currently used to spread and compact waste <br /> and will be continued to be used in the landfill <br /> expansion.Maximum depth of uncompacted waste will <br /> be amoximatelz 2 feet.O eration slo es on ro osed <br /> 0:VNGHA"LI059.D0C M"6 R. W Beck 2-13 <br />