Laserfiche WebLink
RDS' MATRIX <br /> RDSI SECTION REG.CITATION RESPONSE REFERENCE <br /> VI.DISPOSAL SITE CONTROLS <br /> VI.A.LEACHATE MANAGEMENT PLAN <br /> VI.A.1. Leachate Control and <br /> -Monitoring <br /> VI.A.l.a. Monitoring System 14 CCR 17781(c)(1)(A) General layout of the leachate monitoring system is Appendix B, <br /> 14 CCR 17781(b)(3) indicated on Sheets Pl,P3,and P4. Details on Sheets P6 CEP Dwgs. Pl,P3, <br /> and P7 indicate conceptual leachate collection methods. P4,P6,and P7 <br /> FDSR Section 1.3 discusses the leachate collection system. Appendix I,FDSR <br /> An amendment will be filed at the time of final design of Sec.1.3,Pages 1-5 to <br /> each construction phase; this amendment will address 1-12 <br /> the specific materials,methods,and dimensions of <br /> monitoring and will be certified by a registered engineer <br /> or engineering olo 'st. <br /> VI.A.1.b. Monitoring and <br /> Re ortin <br /> VI.A.1.b.1. Frequency 14 CCR 17781(d)(1) An amendment will be filed at the time of final design of <br /> 14 CCR 17781(4)(2) each phase to describe sampling frequency.Minimum <br /> 14 CCR 17781(d)(4) frequency is assumed to be quarterly. <br /> VI.A.l.b.2 Sampling 14 CCR 17781(d)(5) An amendment will be filed at the time of final design of <br /> each phase to describe sampling procedures and analysis <br /> reuirements for chemical parameters. <br /> VI.A.l.b.3 Reporting 14 CCR 17781(d)(6) An amendment will be filed at the time of final design of <br /> each hase to describe reporting requirements. <br /> VI.A.l.c. Leachate Collection 23 CCR 2543 A description of the leachate collection system is outlined Appendix B, <br /> and Removal System 23 CCR 2543(x) in the FDSR. General layout of the leachate collection CEP Dwgs. Pl,P3, <br /> 23 CCR 2543(b) and removal system is indicated on Sheets Pl,P3,and P4,P6 and P7 <br /> P4.Details on Sheets P6 and P7 indicate conceptual Appendix I,FDSR <br /> 23 CCR 2543(d) leachate collection methods.An amendment will be filed Sec. 1.3,Pages 1-5 to <br /> at the time of final design of each phase;this amendment 1-12 <br /> 0:UNGHA"LI059.D0C 11/13/96 R. W Beck 2-17 <br />