Laserfiche WebLink
INTRODUCTION Page 2 <br /> during construction of the horizontal expansion cells will be stockpiled to preload the closed <br /> existing landfill. Although vertical expansion is not addressed in Subtitle D, construction of <br /> Phases V and VI would comply with Subtitle D requirements for new landfills,as discussed above <br /> with a composite liner and leachate collection system constructed over the existing closure area. <br /> The facility will include a secured temporary holding area for hazardous materials screened from <br /> the landfill operations. Materials temporarily stored at this facility will be collected and transported <br /> by a licensed hazardous materials handler to an appropriately permitted disposal site. The site <br /> M plan also provides for future recycling and composting activities. <br /> i <br /> z R.W.Beck and Associates City of Stockton <br /> 1811.002 <br />